Project Background

NGTL GP Ltd., as general partner on behalf of NGTL Limited Partnership (NGTL GP), has filed an application for the Saturn No. 3 Receipt Meter Station. The proposed project involves installation of a new NPS 10 ultrasonic meter station, including an NPS 10 meter run, NPS 4 return run, and associated buildings and piping. The project will connect to NGTL GP’s existing NPS 42 Groundbirch Mainline Loop (Saturn Section) and include an NPS 12 tie–in to the customer’s pipeline. The project will be located entirely on Crown land in NW 21-080-20 W6M, approximately 34 km southwest of Fort St. John, British Columbia. The project will require the acquisition of approximately 0.25 ha of previously disturbed land for the meter station addition and future potential expansions, a. Approximately 0.20 ha of temporary workspace will be required during construction.

Project construction is planned to commence in September 2025, with an expected project-in-service date in November 2025.

Timeline and Documents

Contacts

Get Information

Land Matters Advisory Service
Canada Energy Regulator
Email: LMAS.SCQF@cer-rec.gc.ca
Telephone (toll free): 1-800-899-1265
Facsimile (toll free): 1-877-288-8803

Media Inquiries

Media Relations Team
Canada Energy Regulator
Email: media@cer-rec.gc.ca
Telephone (toll free): 1-800-899-1265

Date modified: