Emera Brunswick Pipeline Company Ltd.’s Brunswick Pipeline
Commodity and NEB Group | Natural Gas (Group 2) |
Average annual capacity | 28 106m³/d (1 Bcf/d) |
Average utilization 2015 | 7% |
Primary receipt points | Canaport LNG Terminal near Saint John, NB |
Primary delivery points | St. Stephen, NB |
Net investment in Direct Financing Lease, 2014 | $485 million |
Revenues 2014Note a | $57 million |
Abandonment Cost Estimate and Collection PeriodNote b | $3.1 million; 40 years |
Source: NEB
Text version of this map
This map provides an overview of the Emera Brunswick Pipeline.
Overview
The Brunswick Pipeline (Brunswick) was commissioned in July 2009 and transports re-gasified natural gas 145 km from the Canaport liquefied natural gas (LNG) import terminal near Saint John, NB to the Canada-U.S. border near St. Stephen, NB. At the border it connects with the U.S. segment of the Maritimes & Northeast Pipeline. Emera Brunswick Pipeline Company Ltd., which owns the pipeline, is a wholly owned subsidiary of Emera Inc., an energy company based in Nova Scotia.
Utilization
Figure 10.8.1 shows capacity and throughput on Brunswick for 2010-2015. Capacity is 28 106m³/d (1 Bcf/d) and in 2015 throughput averaged 1.7 106m³/d (0.06 Bcf/d). Throughput tends to increase in the winter to meet peak demand in the Maritimes and U.S. Northeast market.
Figure 10.8.1: Brunswick Throughput vs. Capacity
Sources: TransCanada, NEB
Text version of this graphic
This bar chart shows throughput and capacity on Emera Brunswick Pipeline between 2010 and 2015. Capacity in 2015 was 28 106m³/d (1 Bcf/d). Throughput averaged 1.7 106m³/d (0.06 Bcf/d) in 2015, compared to 1.3 106m³/d (0.05 Bcf/d) in 2014.
Tolls
Figure 10.8.2 shows the benchmark toll for Brunswick and the GDP deflator (normalized) for 2010-2015. Tolls on Brunswick are set per cargo load per day, and converted to the equivalent price in $US/Million British Thermal Units (MMbtu). Tolls were constant from mid-2009 to mid-2014 at US$0.206 per MMbtu. In July 2014, tolls increased to US$0.216 per MMbtu.Note 1 Tolls will remain at this rate until mid-2024. Tolls were set for 25 years under a Negotiated Toll Agreement between Repsol Energy Canada Ltd. and Emera Brunswick Pipeline Company Ltd. Brunswick is regulated on a complaint basis.
Figure 10.8.2: Brunswick Benchmark Toll
Source: NEB toll filings
Text version of this graphic
This graph shows the Emera benchmark toll as a solid red line and the GDP deflator as a black dashed line. The benchmark toll was from $0.206 from 2010 to mid-2014 then increased to $0.216.
Financial
Emera New Brunswick Pipeline Company Ltd. is a Group 2 Company, operating with a direct financing lease and only one shipper. It maintains negative equity on its balance sheet due to transfer of funds to its parent company, Emera Inc., by way of promissory notes.
Brunswick’s access to debt markets is supported by Emera Inc., which, for example, DBRS assigns a credit rating of BBB (high).
- Date modified: