ARCHIVED - Erratum to National Energy Board Order SO-E101-001-2013 - Erratum to National Energy Board Order SO-E101-001-2013 - Enbridge Pipelines Inc., Request for Time Extension, Corrective Action Plan to Address Non-Compliances with subsection 12(a) of the Onshore Pipeline Regulations 1999 (OPR-99) and Clause 4.14.3.3(c) of CSA Standard Z662-11 Oil and Gas Pipeline Systems (CSA Z662-11)

This page has been archived on the Web

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

Erratum to National Energy Board Order SO-E101-001-2013 - Enbridge Pipelines Inc., Request for Time Extension, Corrective Action Plan to Address Non-Compliances with subsection 12(a) of the Onshore Pipeline Regulations 1999 (OPR-99) and Clause 4.14.3.3(c) of CSA Standard Z662-11 Oil and Gas Pipeline Systems (CSA Z662-11) [PDF 3826 KB]

File OF-Surv-FIns-E101 2011
20 March 2013

Mr. Al Monaco
Chief Executive Officer
Enbridge Pipeline Inc.
3000 Fifth Avenue Place
425 - 1st Street S.W.
Calgary, AB  T2P 3L8
Facsimile 403-231-3920

Dear Mr. Monaco:

Erratum to National Energy Board Order SO-E101-001-2013
Enbridge Pipelines Inc. (Enbridge), Request for Time Extension, Corrective Action Plan to Address Non-Compliances with subsection 12(a) of the Onshore Pipeline Regulations 1999 (OPR-99) and Clause 4.14.3.3(c) of CSA Standard Z662-11 Oil and Gas Pipeline Systems (CSA Z662-11)

The National Energy Board issued Order SO-E101-001-2013 on 14 March 2013. The Board has been made aware of an administrative error in the above-mentioned Order. Please find attached an erratum correcting this error.

Yours truly,

Sheri Young
Secretary of the Board

Attachment

File OF-Surv-FIns-E101 2011
20 March 2013

ERRATUM
ORDER SO-E101-001-2013

Please note that an administrative error in the National Energy Board's Order SO-E101-001-2013 approved by the Board on 14 March 2013 is corrected as follows:

"WHEREAS the Board regulates the operation of the Enbridge and Enbridge Bakken systems on which non-compliances with the OPR-99 sub-section  (a) and CSA Z662-11, Clause 4.14.3.3(c) were identified during inspections on Enbridge Pipelines on 20 and 25-27 October 2011 and on Enbridge Bakken on 2-3 October 2012."

Date modified: