ARCHIVED - TransCanada PipeLines Limited - NPS 36 NOVA Gas Transmission Ltd. North Central Corridor Buffalo Creek West Section

This page has been archived on the Web

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

TransCanada PipeLines Limited - NPS 36 NOVA Gas Transmission Ltd. North Central Corridor Buffalo Creek West Section [PDF 413 KB]

OF-Surv-In-2013-146

10 September 2015

Mr. Dave Murray
Manager, Canadian Regulatory Compliance
TransCanada Pipelines Limited
450 - 1st Street S.W.
Calgary, Alberta, T2P 5H1

Dear Mr. Murray:

Re: TransCanada PipeLines Limited (TransCanada)
NPS 36 NOVA Gas Transmission Ltd. North Central Corridor (NCC) Buffalo Creek West Section (Loop)

Following Incident 2013-146, in a letter dated 29 May 2015, TransCanada submitted an Engineering Assessment which demonstrated that the operating pressure on the NCC Buffalo West Creek Section from NCC30-1-BV to NCC20-1-BV can safely be increased from the restricted pressure of 7750 kPa to the licensed maximum operating pressure of 9930 kPa, while maintaining a maximum discharge temperature of 40 degree Celsius at the Woodenhouse compressor station. As such, the undersigned Inspection Officer has lifted Inspection Officer Order No. KF-001-2014.

If you have questions, you can reach the undersigned Inspection Officer at Information not available.

Sincerely,

_____________________
Information not available
Inspection Officer #2083