Notice to Resume Work or of Measures Satisfied – Westcoast Energy Inc., carrying on business as Spectra Energy Transmission – Order NB-001-2018 (Amendment No. 2) – Notice No. 1

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE NATIONAL ENERGY BOARD ACT,
FOLLOWING AN ORDER UNDER SECTION 51.1

The undersigned National Energy Board Inspection Officer hereby notifies

Information not available

Westcoast Energy Inc., carrying on business as Spectra Energy Transmission that the hazardous or detrimental situation described in Order No. NB-001-2018 (Amendment No. 2) has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •       Suspended work may resume, and/or
  •  X  Specified Measure (a) of the order has been satisfied for Segment 9 of the NPS 36 L2 for operation at its Maximum Operating Pressure; and
  •  X  Specified Measure (c) of the order has been satisfied for the NPS 30 L1 between Compressor Station 4A and Compressor Station 4B for operation at its Maximum Operating Pressure.

Dated: 30 November 2018

Inspection Officer
Inspection Officer Information not available Information not available Information not available
Name IO Designation # Telephone
30 November 2018 Information not available
Signature
Date
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA or Incident #: INC2018-142

Date modified: