Notice to Resume Work or of Measures Satisfied –Trans Mountain Pipeline ULC (Trans Mountain) – Order BL-001-2022

Notice to Resume Work or of Measures Satisfied –Trans Mountain Pipeline ULC (Trans Mountain) – Order BL-001-2022 [PDF 348 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies Trans Mountain Pipeline ULC (Trans Mountain) that the hazardous or detrimental situation described in Order No. BL-001-2022 has been fully remedied to the satisfaction of the Inspection Officer.

Therefore,

  •    Suspended work may resume.
  •  X the measures specified in the Order have been satisfied
Inspection Officer
Inspection Officer Information not available Information not available Information not available
Name Inspection Officer Designation Number Telephone
14 February 2023 Information not available
Signature
Date

210-517 10 Ave SW, Calgary AB  T2R 0A8

Date modified: