ARCHIVED - National Energy Board Onshore Pipeline Regulations (OPR) - Final Audit Report of the Enbridge Pipelines Inc. Integrity Management Program - Appendix IV - Documents Reviewed
This page has been archived on the Web
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
Appendix IV
Enbridge Pipelines Inc.
Documents ReviewedFootnote * - Integrity Management Program
Name |
---|
02 IN 5.0 D PI-84 Management System Review Procedure V01 |
02 IN 5.0 R 2012 Management Review Integrity Management System V01 |
02 Major Outage Coordination Upstream Downstream Lines |
02 Major Outage Coordination Upstream Lines (April 09, 2014) NEB-regulated1 |
02 NEB tanks 2014 and OOS inspections planned Rev1 |
02 PIMS (IMS-09) Framework V01 |
02 Response 2014 Station Piping Scope of Work- NEB-Regulated Assets |
02 Response Eastern Canada Dig Schedule - Line 9 |
02 Response Eastern Canada Dig Schedule - Lines 8 and 11 |
02 response NEB Regulated Pressure Vessels - Shipped Product Only |
02 response Pig Runs-ILI -Maintenance Pigging Activities - May to August 2014 |
02 response Station Piping Asset List - High IC Susceptible - NEB-Regulated Assets |
02 response Western and Central Canada Dig Schedule |
03242014 - Integrated Management System - NEB Auditor Presentation (PDF) |
03262014 - Integrated Management System - NEB Auditor Presentation (Dist) |
1. Enbridge Liquids Pipelines Pipeline Integrity NDE Scope of work Canada and US, Version 2.0 - Jan 31 2014 - Final |
1. Mainline Integrity NDE Vendor Approved List |
10. Line 9 GW 57390 MP 2220.1414 ML-CD_Redacted |
11 0 FI Facility Piping LRP |
11 1 FI AST LRP |
11 2 FI UST (sumps) LRP |
11 4 FI Pressure Vessel LRP |
11 5 FI Laterals LRP |
11 6 FI SDP LRP |
11. L-9_MP_1977.6624-_GW_28190_Integrity_Field_Report_May_2-3__2014 Acuren May 6 |
11. L-9_MP_1977.6624-_GW_28190_Integrity_Field_Report_May_2-3__2014 Acuren Personnel List_Redacted |
11. L-9_MP_1977.6624-_GW_28190_Integrity_Field_Report_May_2-3__2014 Additional Info and Definitions |
11. L-9_MP_1977.6624-_GW_28190_Integrity_Field_Report_May_2-3__2014 Dig Site Photos |
11. L-9_MP_1977.6624-_GW_28190_Integrity_Field_Report_May_2-3__2014 Enbridge Cobourg Yard Personnel_Redacted |
11. L-9_MP_1977.6624-_GW_28190_Integrity_Field_Report_May_2-3__2014 May 2014_Redacted |
11. L-9_MP_1977.6624-_GW_28190_Integrity_Field_Report_May_2-3__2014 Scope GW 28190 |
12. Canada Master Bible |
12. Fwd_ Personnel Certification SGS_Redacted |
13. Acuren Enbridge Meeting Minutes 2014-05-15 |
14. PI-27__NDE_Field_Report_QA_and_Validation |
15. NDE QA Manual v.0.95 |
16. FAQ Nov.1st 2012 Final |
17. Enbridge NDE On-Call FAQ Welding Grinding |
2. Enbridge Liquids Pipelines Pipeline Integrity NDE Scope of work Canada and US, Version 2.0 - Jan 31 2014 - Final |
2. Outlier Checklist - Corrosion L9 MP 2253.1299 GW 9890- v1.0 - 01-16-2013 |
2014 Audit IR Response Status Check_040414 |
2014 Eastern Helicopter Planning Schedule |
2014 NEB Audit - All Asset Registry - Eastern Region |
2014 NEB Audit - All Asset Registry - EPSI Region |
2014 NEB Audit - All Asset Registry - Northern Region |
2014 NEB Audit - All Asset Registry - Western Region |
2014 NEB Audit - Asset Registry - Central Region |
2014 NEB Audit - Central Region Org Chart |
2014 NEB Audit - Central Region PSV's |
2014 NEB Audit - Central Region Stations and Terminals |
2014 NEB Audit - Eastern Region Org Chart |
2014 NEB Audit - Focus Area - Communication V2 |
2014 NEB Audit - Focus Area - Integrity Management Program Overview (Mar 26-2014) |
2014 NEB Audit - Focus Area - PlanningV2 |
2014 NEB Audit - Focus Area - Quality Management (Mar 27-2014) |
2014 NEB Audit - Integrity Focus Area - Corrosion Control |
2014 NEB Audit - Integrity Planning - Prevent Monitor Mitigate |
2014 NEB Audit - Life Cycle Asset Management DE March 24 |
2014 NEB Audit - LP Risk Management Functions |
2014 NEB Audit - PI Overview |
2014 NEB Audit - PI Program Execution |
2014 NEB Audit - Pipe Asset Registry - Central Region |
2014 NEB Audit - Pipe Asset Registry - Eastern Region |
2014 NEB Audit - Pipe Asset Registry - EPSI Region |
2014 NEB Audit - Pipe Asset Registry - Northern Region |
2014 NEB Audit - Pipe Asset Registry - Western Region |
2014 NEB Audit -Eastern Region PSV's |
2014 NEB Audit -Eastern Region Stations and Terminals |
2014 NEB Audit -EPSI PSV's |
2014 NEB Audit -EPSI Region Org Chart |
2014 NEB Audit -EPSI Stations and Terminals |
2014 NEB Audit -Field Operations Services Org Chart |
2014 NEB Audit Information Exchange Agenda - Emergency and Security Management |
2014 NEB Audit Information Exchange Agenda - Environment Management |
2014 NEB Audit Information Exchange Agenda - Integrity Management Program |
2014 NEB Audit Information Exchange Agenda - Integrity Management Program (March 26-27) |
2014 NEB Audit Information Exchange Agenda - Public Awareness and Crossings |
2014 NEB Audit Information Exchange Agenda - Safety Management System V2 |
2014 NEB Audit -Northern Region Org Chart |
2014 NEB Audit -Northern Region PSV's |
2014 NEB Audit -Northern Region Stations and Terminals |
2014 NEB Audit -Northern Region Sump Tanks |
2014 NEB Audit -Western Region Org Chart |
2014 NEB Audit -Western Region PSV's |
2014 NEB Audit -Western Region Stations and Terminals |
2014 NEB Audit -Western Region Sump Tanks |
2014 SCOPE OF WORK-FLANGE-STATION PIPING-LATERAL-PROGRAMS |
2014 Tank Inspection Plan for Central Region |
2014-02-14_Integrity Management Program Presentation |
3. Outlier Checklist - Cracking - L4 MP 290.3794 GW 31160 |
3. PLI Field Personnel Matrix 2013_Redacted |
4. L1 MP 734.6808 GW 157220 Crack 2014 |
4. List of Acuren Technicians - 2014-06-23_Redacted |
4.4 GV D Email Management Policy V01 |
4.4 GV D Records Discovery Policy V01 |
4.4 GV D Records Management Policy V01 |
4.4 GV D Records Retention Schedule V01 |
4.4 GV D Retention Schedule Development Sustainment Standard V01 |
4.4_GV_Documents and Records Summary |
4.4_GV_Response to NEB IR No 1 |
5. 2014 Enbridge Pipeline Integrity Tutorial Agenda |
5. Line 9 GW 57390 MP 2220.1414 ML-CD_Redacted |
6. Eastern Canada Tutorial Attendance Sheet May 11 2014_Redacted |
6. PI-04_Pressure_Restrictions |
7. FAQ Jan 16 2013 Final |
7. Western Canada NDE Tutorial Acuren Attendance May 09 2014_Redacted |
8. MP 772.1457 NDEConstruction Quality Inspection Form Rev 1 July-02 |
9 3 Drop-In Replacements Program |
9 4 Cathodic Protection Program Document |
9 5 Depth of Cover Geohazards Program |
9. Field Call Form |
Annual Tank Inspections Completed in 2013 - Cromer Terminal |
Annual Tank Inspections Completed in 2013 - Gretna Terminal |
Att GV 2 - Inventory of Hazards and Potential Hazards |
Att GV 3 - Identifying and Communicating Legal Requirements |
Att GV 4 - Field Operations Training Update |
Att GV 5 - Interim Training Verification Solution (Electrical Role) |
Att GV 6 - Process for Developing Competency and Training Program |
Att IN 1 - IMS-09 Compliance Register (Master) - NEB Audit Print-out |
Att IN 10 - PIMS Documents With Effective Date |
Att IN 2 - 2014 NDE Tutorial Training Invitation |
Att IN 3 - 2014 NDE Tutorial Session Agenda |
Att IN 4 - 2014 NDE Tutorial Session - Sample Presentation |
Att IN 5 - 2014 NDE Tutorial Session - Vendor Attendance Sheet_Redacted |
Att IN 6 - 2013 NDE Tutorial Session Agenda |
Att IN 7 - 2013 NDE Tutorial Session - Sample Presentation 2_Redacted |
Att IN 8 - L-95_MP 1749 6725 GW 9720 Integrity_Field_Report_Acuren _Aug 9_2014 |
Att IN 9 - L-95_MP 1799 0167 GW 79180 Integrity_Field_Report_-SGS Aug 6_2014 |
Attachment 1 - BH-01 trap at 15-35-3-13 W2M |
Attachment 2 - 15-35-3-13 W2 Post Construction-2 |
Attachment 3 - 15-35-3-13 W2 Post Construction-5 |
Attachment 4 - 2013 Steelman Terminal Guided Wave Inspection Report |
Attachment 5 - 2013 Pig sender kicker line at Steelman 9-13-4-6W2 |
Attachment 6 - MP 14 40 Alida Relief Line Upgrade |
Canadian Pinpoint and FSM-IT monitors |
Cathodic Protection - Tanks_V9 |
CCG - Chapter 1 Basic Corrosion Theory |
CCG - Chapter 4 Cathodic Protection |
CCG - Chapter 5 Designing Cathodic Protection Systems |
Central Region Depth of Cover Spreadsheet |
Central Region PSV Maintenance Report r1 |
Centrifuge |
Document 1 |
Document 2 |
Consultant Response for Using 1000mV Criteria in GTA |
Consultant's annual CP survey report - Executive Summary |
Copy of Historical Corrosion Rates and Remaining Life |
Copy of INTEGRITY IRs - Facilities Integrity - Sept 15 2014 |
CSA Z662_Defect Assessment in Class Location |
Document |
Dig Selection Criteria - rev Aug 12 2014 |
DMAT Monitoring Report - Line 9 Station Bypass at North Westover Station - 2009 |
DOC Central Region 2010 (Records)_Redacted |
DOC Central Region 2010 (Spreadsheet)_Redacted |
DOC Western Region 2010 (Spreadsheet and Records)_Redacted |
Eastern Region Depth of Cover Spreadsheet |
Eastern Region PSV Maintenance Report r1 |
Employee Type by Region |
ENBRIDGE (WOODLAND) HDD EVAL_EA (3) |
Enbridge Annual Tank Inspection CHECKLIST |
Enbridge Assets by NEB Entity |
Enbridge Final Responses to close-out discussion |
Enbridge Mainline Patrols_Western, Central and Northern |
EPSI Region PSV Maintenance Report r1 |
EPWI Gathering Lines Info and Lateral Listing |
Evaluation of Coating Pipe Condition |
Excerpt showing 2014 LRT Initiatives (from Leak Reduction Team Agenda March 27 2014) |
Facilities Integrity 2014 Path to Zero R2 |
FI Presentation for NEB 2014 March |
Field Inspection Template |
Gathering Line Risk Assessment Model Guidance Document Revision 1 Aug 2014 |
GEN 20.5 2014 Top Canadian Mainline Risk Segments (writeup) updated |
GV 1 2 Documents and Records Summary |
GV 1.2 D IMS 01 Governing Policies and Processes |
GV 1.2 Response to NEB IR No 1 |
GV 2 3 Response to NEB IR No 1 |
GV 2.1 D IMS-01 Governing Policies and Processes V1.0 |
GV 2.1 D LP Mainline Risk Modeling Presentation - 3-28-2014 |
GV 2.1 Documents and Records Summary |
GV 2.1 Response to NEB IR No 1 |
GV 2.2 D IMS-01 Governing Policies and Processes V1.0 |
GV 2.2 D IMS-02 Compliance and Ethics Management System V1.0 |
GV 2.2 Documents and Records Summary |
GV 2.2 R Legal Updates elink page V1.0 |
GV 2.3 D IMS-01 Governing Policies Processes |
GV 2.4 Document and Records Summary |
GV 2.4 Response to NEB IR No. 1 |
GV 3 3 Response to NEB IR No 1 |
GV 3 5 Response to NEB IR No 1 |
GV 3.3 D OMS Appendix IV Change Management Process V01 |
GV 3.3 D OMS Operating-Maintenance Procedures Management System Document V01 |
GV 3.3 R CriticalUpdate Bk7 V9 2013-12-31 REV12-13 MEMO V01 |
GV 3.3 R Deviation B3 06-03-20 CAN 2012-09-14 V01 |
GV 3.4 HR - Response to NEB IR No. 1 |
GV 3.4 HR Documents and Records Summary |
GV 3.4 OPS - Documents and Record Metadata Table |
GV 3.4 OPS - Response to NEB IR No. 1 |
GV 3.5 Documents and Records Summary |
GV 3.6 D Document Owner-Stakeholder List V01 |
GV 3.6 R Annual Review Schedule V01 |
GV 3.6 R Annual Update Bk7 V9 2011-12-01 MEMO V01 |
GV 3.6 R BOOK 7 Change Markups 2013-12-15 V01 |
GV 3.6 R CriticalUpdate Bk7 V9 2013-12-31 REV12-13 MEMO V01 |
GV 3.6 R FORM-B0-D-001_DEVIATION REQUEST FORM |
GV 3.6 Response to NEB IR No 1 |
GV 4 1 Response to NEB IR No 1 |
GV 4 2 Response to NEB IR No 1 |
GV 4.1 D IMS 01 Governing Policies and Processes |
GV 4.2 D IMS 01 Governing Policies and Processes |
GV 4.3 D 1. Cover |
GV 4.3 D 2. Table of Contents |
GV 4.3 D Chapter 1 Who We Are |
GV 4.3 D Chapter 2 Introduction to Paisley GRC |
GV 4.3 D Chapter 3 Audit Plan Development |
GV 4.3 D Chapter 4 Audit Planning Engagement Phase |
GV 4.3 D Chapter 5 Audit Program and Fieldwork |
GV 4.3 D Chapter 6 Document Review and Approval |
GV 4.3 D Chapter 7 Audit Report and Close |
GV 4.3 D Chapter 8 Condition Tracking and Action Plans |
GV 4.3 D Chapter 9 Time Reporting and Audit Administration |
GV 4.3 D IMS 01 Governing Policies and Processes |
GV 4.3 D PC-1001 Internal Stakeholder Department Reviews Procedure |
GV 4.3 D PC-1003 Integrated Review Practice |
GV 5 0 Document and Record Summary |
GV 5 0 Response to NEB IR No 1 |
GV 5.0 D IMS 01 Governing Policies and Processes |
GV_1. 1_Documents and Records Summary |
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Bakken Pipeline Company Inc |
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Inc |
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Pipelines (NW) Inc |
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Pipelines (Westspur) |
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Southern Lights |
GV_1.1_Response to NEB IR No 1 |
GV_1.2_D_ IMS 07 Emergency and Security Management System V1.0 |
GV_1.2_D_IMS-04 Occupational Health and Safety Management System_V01 |
GV_1.2_D_LP Scorecard 2013 Nov 13_Redacted |
GV_1.2_D_PIMS (IMS-09) Framework_V01 |
GV_1.2_R_Compliance Policy |
GV_1.2_R_LP Scorecard 2013 Nov 13_Redacted |
GV_1.2_R_Statement on Business Conduct |
GV_2.1_D_Department Risk Management Process Description |
GV_2.1_D_Department Risk Management Process Map |
GV_2.1_D_High Consequence Area Definitions (March 3rd 2011) |
GV_2.1_D_LP Risk Report Management Process Description |
GV_2.1_D_LP Risk Report Management Process Map |
GV_2.1_D_Risk Management Policy |
GV_2.1_D_Risk Management Processes |
GV_2.1_R_Liquid Facility Risk Assessment Model Weightings 2011-2012 |
GV_2.1_R_ORM Risk Model |
GV_2.2_Response to NEB IR No 1 |
GV_2.3_D_Field Operations Department Plan |
GV_2.3_Documents and Records Summary |
GV_2.4_D_10.2 HR_WFP Procedure Manual_V01 |
GV_2.4_D_10.3 HR_WFP Quick Reference Guide_V01 |
GV_2.4_D_10.4 HR_WFP FAQ_V01 |
GV_2.4_R_ Position_Description Template _V01 |
GV_2.4_R_10.13 HR_ Job Ladders for Govt and Public Affairs _V01 |
GV_3 6_Documents and Records Summary |
GV_3.3_D_B1_06-02-01 |
GV_3.3_D_FORM-B0-D-001_DEVIATION REQUEST FORM |
GV_3.3_D_IMS 01 Governing Policies and Processes |
GV_3.3_Documents and Records Summary |
GV_3.4_D_Appendix 1 - Training Matrices |
GV_3.4_D_Appendix 2 - TRAC Syllabus 2013 |
GV_3.4_D_Appendix 3 - Health and Safety Forms |
GV_3.4_D_Current State Report 051214 |
GV_3.4_D_HR 1Content Development - Content Build (Mar 30)_V01 |
GV_3.4_D_HR 20120914 ALD Governance Structure_V01 |
GV_3.4_D_HR Administrator - Resources_V01 |
GV_3.4_D_HR eLMS Client Orientation_2013_V01 |
GV_3.4_D_HR eLMS Roles and Responsibilities_V01 |
GV_3.4_D_HR ENBU Guiding Principles_V01 |
GV_3.4_D_HR End User - Job Aids List_V01 |
GV_3.4_D_HR IDP FAQ 2014 2_V01 |
GV_3.4_D_HR IDP Instructions 2_V01 |
GV_3.4_D_HR Individual Contributor Competencies GT_V01 |
GV_3.4_D_HR LD Competency Framework Process_V01 |
GV_3.4_D_HR LDRSHIP Dev Framework 3_V01 |
GV_3.4_D_HR Manager - Job Aids List_V01 |
GV_3.4_D_HR What Makes an Individual Development Plan IDP Rev 2_V01 |
GV_3.4_D_OPS Competency Matrix V01 |
GV_3.4_D_OPS Matrix Verification Report V01 |
GV_3.4_D_OPS Tech Training Mgmnt System V01 |
GV_3.4_R_Record - Forecast Report |
GV_3.4_R_Record - Metrics |
GV_3.4_R_Record - Operations Competency |
GV_3.4_R_Record - PLM Test - Matrix verification |
GV_3.4_R_Record - PLM Test - Student all Report |
GV_3.4_R_Record - Supervisor Report |
GV_3.4_R_Record - TRAC - Quick Ref Card |
GV_3.4_R_Record - TRAC Screen |
GV_3.4_R_Record - Training Completion |
GV_3.5_D_IMS 04 Occupational Health and Safety Management System |
GV_3.5_D_IMS 06 Environmental Management System |
GV_3.5_D_IMS 07 Emergency and Security Management System |
GV_3.5_R_Operational Reliability Review Nov 26 |
GV_3.6_D_Documents Policy |
GV_3.6_D_Governance Documents Library How To |
GV_3.6_D_IMS 02 Compliance and Ethics_V01 |
GV_3.6_D_OMS_Operating-Maintenance Procedures Management Standard Document_V01 |
GV_3.6_D_Procedure Library Processes |
GV_3.6_R_Governance Documents Library Communication |
GV_3.6_R_Governance Documents Library FAQs |
GV_3.6_R_Procedure Library Communication |
GV_4 2_D_B1_02-02-01_rev12 |
GV_4 3_Documents and Records Summary |
GV_4.1_Documents and Records Summary |
GV_4.2_D_B1_02-02-03 |
GV_4.2_D_EnCompass - IMS Participant Manual (Enterprise) |
GV_4.2_D_LRS User Manual |
GV_4.2_Documents and Records Summary |
GV_4.3_Response to NEB IR No 1 |
HDD Coating Evaluation |
IMS-09 Compliance Register (Master) |
IN 3.1 D Book 3 Pipeline Facilities Cathodic Protection 08-02-02 V01 |
IN 3.1 D CCG - Chapter 4 Cathodic Protection V01 |
IN 3.1 D CCG - Chapter 7 Conducting an Annual CP Survey V01 |
IN 3.1 D CCG - Chapter 8 Rectifier and Bond Assessments V01 |
IN 3.1 D CCG APPENDIX A Corrosion Control Forms V01 |
IN 3.1 D CCG Introduction V01 |
IN 3.1 D Corrosion Control Org Chart V01 |
IN 3.1 D O3C Org Chart V01 |
IN 3.1 D O3C Terms of Reference V01 |
IN 3.1 R Eastern Line 8 Sample Testpoint Report V01 |
IN 3.1 R Eastern Line 9 Sample Rectifier Report V01 |
IN 3.1 R NDE Report Summary |
IN 4.1 D PI-14 Event Learning Process V03 |
IN 4.1 D PI-84 Management System Review Procedure V01 |
IN 4.2 D Field and Metallurg Failure Investig V03 |
IN 4.2 D Incident Resp and Prepared Plan V1.0 |
IN 4.2 D PI-14 Event Learning Process V03 |
IN 4.2 D PI-85 Regulatory Compliance Procedure V01 |
IN 4.2 D Root Cause Failure Invest Guideline V01 |
IN 5.0 D PI-14 Event Learning Process V03 |
IN 5.0 D PI-84 Management System Review Procedure V01 |
IN 5.0 R 2012 Management Review Integrity Management System V01 |
IN R Depth of Cover Records - Central Region |
IN R Depth of Cover Records - Western Region |
IN W-B 2 1 Document and Record Summary |
IN_2.1_D_App A - Pressure Vessels Inspection_V1.4 |
IN_2.1_D_B3_05-03-06_Assessing Metal Loss_V12 |
IN_2.1_D_B3_06-03-17_Tightening-Torq Flanges_V12 |
IN_2.1_D_Corrosion Assessment Interval Plan_V2.4 |
IN_2.1_D_Corrosion IL Inspection Analysis Plan_V2.1 |
IN_2.1_D_Crack Management Plan_V2.1 |
IN_2.1_D_Crack Threat Assessment_V1.1 |
IN_2.1_D_D04-101_CP Mainline and Station_V01 |
IN_2.1_D_FI Management Flange Integrity_V3.6 |
IN_2.1_D_FI Management Framework_V04 |
IN_2.1_D_FI Mgmt Prog Small Diameter Piping_V3.8 |
IN_2.1_D_FI Mgmt Prog Sump Tks_V3.3 |
IN_2.1_D_FI Mgmt Program Aboveground Tank_V3.8 |
IN_2.1_D_FI Mgmt Program Laterals_V3.5 |
IN_2.1_D_FI Mgmt Program Pressure Vessels_V4.1 |
IN_2.1_D_FI Mgmt Program Station Piping _V3.8 |
IN_2.1_D_FI-01 Identification Hazards Threats_V3.7 |
IN_2.1_D_FI-02 Communication Process Mar2014_V3.6 |
IN_2.1_D_FI-10 Establish Yearly Release Metrics_V02 |
IN_2.1_D_Guide Stn Piping_V01 |
IN_2.1_D_Mechanical Damage Management Plan_V1.2 |
IN_2.1_D_PI-08 ILI Report Collection etc_V04 |
IN_2.1_D_PI-09 NDE Field Report Collection etc_V03 |
IN_2.1_D_PI-14 Event Learning Process_V03 |
IN_2.1_D_PIMS (IMS-09) Framework_V02 |
IN_2.1_D_Roles, Responsib Authorities 2013 Apr_V3.7 |
IN_2.1_D_Vendor Training Qualification Procedure_V3.9 |
IN_2.1_R_B1-18_Att8_Facilities_EngAssessment_V01 |
IN_2.1_R_B-19E_Att1_NEB_IR_A2R2H7_V01 |
IN_2.1_R_Branch Connection LOF Sheets_V01 |
IN_2.1_R_L9 Plan to Manage Cracking Condition 11_V01 |
IN_2.1_R_Water Course Crossing Ppt_V01 |
IN_2.2_D_PI-14 Event Learning Process_V03 |
IN_2.2_D_PI-15 Pipeline Integrity Management System (PIMS) Document Review Form_V01 |
IN_2.2_D_PI-15 Pipeline Integrity Management System (PIMS) Document Review_V02 |
IN_2.2_D_PI-85 Regulatory Compliance Procedure_V01 |
IN_2.2_D_PIMS (IMS-09) Framework_V02 |
IN_2.2_Documents and Records Summary |
IN_2.2_Response to NEB IR No 1 |
IN_2.3_D_PI-84 Management System Review Procedure_V01 |
IN_2.3_D_PIMS (IMS-09) Framework_V02 |
IN_2.3_Documents and Records Summary |
IN_2.3_R_PI Department Plan 2014_V11 |
IN_2.3_R_Scorecard Pipeline Integrity 2013_V02 |
IN_2.3_Response to NEB IR No 1 |
IN_2.4_D_PI-84 Management System Review Procedure_V01 |
IN_2.4_D_PIMS (IMS-09) Framework_V02 |
IN_2.4_Documents and Records Summary |
IN_2.4_R_PI Department Plan 2014_V11 |
IN_2.4_R_PI Functional Org Chart Mar 15 13_V01 |
IN_2.4_Response to NEB IR No 1 |
IN_3.1_D_App A - Pressure Vessels Insp Scope of Work Oct 2013_V1.4 |
IN_3.1_D_Appendix A - Tool and Technology Description_V02 |
IN_3.1_D_Appendix B - Tool Selection Rationale_V02 |
IN_3.1_D_Appendix C - Flowchart Figures_V01 |
IN_3.1_D_Book 3 Pipeline Facilities Corrosion Control_V11 |
IN_3.1_D_Book 3 Pipeline Facilities ROW Monitoring_V12 |
IN_3.1_D_Book 3 Pipeline Facilities Tank Inspections_v12 |
IN_3.1_D_Cathodic Protection Program_V2.1 |
IN_3.1_D_Coating Integrity Program_V02 |
IN_3.1_D_Corrosion Assessment Interval Plan_V2.4 |
IN_3.1_D_Corrosion Growth Rate Plan_V4.1 |
IN_3.1_D_Corrosion In-Line Inspection Analysis Plan_V2.1 |
IN_3.1_D_Corrosion Integrity Management Plan_V02 |
IN_3.1_D_Crack Management Plan_V2.1 |
IN_3.1_D_Crack Management Plan_V2.2 |
IN_3.1_D_Crack Program Summary_V2.1 |
IN_3.1_D_Crack Susceptibility Guidelines, Fatigue and SCC_V1.1 |
IN_3.1_D_Crack Threat Assessment_V1.1 |
IN_3.1_D_Enbridge ILI Reporting Profile Standard_V7.1 |
IN_3.1_D_Excavation Program_V4.1 |
IN_3.1_D_FI Management Program for Laterals 2013 June 5_V3.5 |
IN_3.1_D_FI Management Program for Station Piping 2013 July 24_V3.8 |
IN_3.1_D_FI Mgmt Framework 2013 Apr_V04 |
IN_3.1_D_FI Mgmt of Flange Integrity Feb2012_V3.6 |
IN_3.1_D_FI Mgmt Prgm for the Insp of Pressure Vessels Oct 2013_V4.1 |
IN_3.1_D_FI Mgmt Prgm for the Rplcmnt and Mntrng of Sump Tanks Feb 2012_V3.3 |
IN_3.1_D_FI Mgmt Program Aboveground Tank Integrity 2014 March 10_V3.8 |
IN_3.1_D_FI Mgmt Program for Small Diameter Piping 2013 Oct 22_V3.8 |
IN_3.1_D_Gathering Systems Operating and Maintenenace Procedures Manual_V01 |
IN_3.1_D_Girth Weld Numbering Guideline_V03 |
IN_3.1_D_IMP - TABLE OF CONTENTS_V01 |
IN_3.1_D_IMP 00-01-01- Objectives_V01 |
IN_3.1_D_IMP 00-01-02- Summary of Commitment_V01 |
IN_3.1_D_IMP 00-02-01- Risk and Risk Management_V01 |
IN_3.1_D_IMP 00-02-02- Organizational Lines of Responsibility_V01 |
IN_3.1_D_IMP 00-02-03- Training_V01 |
IN_3.1_D_IMP 00-02-04- Regulatory Requirements_V01 |
IN_3.1_D_IMP 00-02-05- Program Metrics_V01 |
IN_3.1_D_IMP 00-02-06- Program Review_V01 |
IN_3.1_D_IMP 00-02-07- Document Management_V01 |
IN_3.1_D_IMP 00-02-08- Communication Plan 5-12-08- Clean_V01 |
IN_3.1_D_IMP 01-01-01- Pipeline Integrity Objectives__V01 |
IN_3.1_D_IMP 01-01-02- Pipeline assessment_V01 |
IN_3.1_D_IMP 01-02-01- Pipeline Risk Model_V01 |
IN_3.1_D_IMP 01-02-02- Pipeline Repair Program_V01 |
IN_3.1_D_IMP 01-02-03- Cathodic Protection Program_V01 |
IN_3.1_D_IMP 01-02-04- Chemical Injection Program_V01 |
IN_3.1_D_IMP 01-02-05- SCC Management Program_V01 |
IN_3.1_D_IMP 01-03-01- Pipeline Repair Guideline Document_V01 |
IN_3.1_D_IMP 01-03-02- Defect Assessment Procedure_V01 |
IN_3.1_D_In-Line Inspection Program_V04 |
IN_3.1_D_Internal Corrosion Control Program_V4.0 |
IN_3.1_D_Mechanical Damage Management Plan_V1.2 |
IN_3.1_D_NDE Scope of Work_V1.2 |
IN_3.1_D_PI-02 Excavation Package Preparation, Issue, Revision and Cancellation_V05 |
IN_3.1_D_PI-03 Developing a Dig List from PI Listing_V6.1 |
IN_3.1_D_PI-04 Pressure Restrictions_V4.1 |
IN_3.1_D_PI-05 Criteria for Excavation Prioritization_V2.1 |
IN_3.1_D_PI-06 Pressure Cycling Monitoring (PCM)_V1.2 |
IN_3.1_D_PI-11 Hydrostatic Test Procedure_V02 |
IN_3.1_D_PI-12 Vendor Issues Management_V1.2 |
IN_3.1_D_PI-13 Investigation of Corrosion ILI and NDE Outliers_V04 |
IN_3.1_D_PI-16 Corrosion Assessment Interval Determination Analysis_V1.3 |
IN_3.1_D_PI-18 Metal Loss Unity Plot Creation and Review_V03 |
IN_3.1_D_PI-19 Severe Corrosion Feature Review_V04 |
IN_3.1_D_PI-20 Echo Loss Review_V02 |
IN_3.1_D_PI-21 Degraded or Missing Data Review_V1.2 |
IN_3.1_D_PI-22 Metal Loss ILI Data Integration_V2.1 |
IN_3.1_D_PI-23 Upper Bound Corrosion Growth Rate Analysis_V1.1 |
IN_3.1_D_PI-27 NDE Field Report QA and Validation_V04 |
IN_3.1_D_PI-29 Priority Notifications_V2.1 |
IN_3.1_D_PI-30 Pipeline Depth monitoring Mechanical Damage Management Programs_V2.1 |
IN_3.1_D_PI-32 ILI Data Integration_V1.1 |
IN_3.1_D_PI-34 Dig List Management for Metal Loss Programs_V1.3 |
IN_3.1_D_PI-36 Crack ILI Report Review_V2.2 |
IN_3.1_D_PI-37 Fitness-for-Purpose Calculations for Crack ILI Features_V2.3 |
IN_3.1_D_PI-38 Crack Excavation Selection Criteria_V3.2 |
IN_3.1_D_PI-39 Crack ILI vs. Field NDE Trending_V03 |
IN_3.1_D_PI-40 Crack ILI Outlier Analysis_V03 |
IN_3.1_D_PI-41 Crack ILI Interval Determination_V03 |
IN_3.1_D_PI-42 Geometry ILI Report Review_V1.1 |
IN_3.1_D_PI-43 Developing a Mechanical Damage Dig List_V2.1 |
IN_3.1_D_PI-44 Mechanical Damage Severe Feature Review_V1.1 |
IN_3.1_D_PI-45 Technical Assessment of Mechanical Damage Features_V1.1 |
IN_3.1_D_PI-46 Mechanical Damage Trending_V1.1 |
IN_3.1_D_PI-47 Corrosion Excavation Criteria_V2.1 |
IN_3.1_D_PI-51 Features Requiring Monitoring Review_V2.1 |
IN_3.1_D_PI-52 Unique Feature Review_V02 |
IN_3.1_D_PI-53 Field Sampling Procedure_V1.2 |
IN_3.1_D_PI-54 Girth Weld Crack Management_V02 |
IN_3.1_D_PI-56 Sleeve Landing Analysis_V01 |
IN_3.1_D_PI-57 In-Line Inspection and Tracking Data Validation_V01 |
IN_3.1_D_PI-59 Procedure for Integrating Post Construction Geometry Survey Data_V01 |
IN_3.1_D_PI-65 ILI Pre Launch Assessment Procedure_V01 |
IN_3.1_D_PI-68 Priority Field Reconnaissance Request Procedure_V01 |
IN_3.1_D_PI-69 Procedure for Pipeline Replacement Assessments_V02 |
IN_3.1_D_PI-75 Dig Exceeding Deadline and Dig Deadline Ext Request_V02 |
IN_3.1_D_PI-78 Major Projects Review Guideline_V1.1 |
IN_3.1_D_PI-81 PI Projects' Sponsorship Roles, Responsibilities_V01 |
IN_3.1_D_PI-86 Research and Development Process_V01 |
IN_3.1_D_PI-87 Research and Development Idea and Proposal Procedure_V01 |
IN_3.1_D_PIMS (IMS-09) Framework_V02 |
IN_3.1_D_Priority Notification Template_V01 |
IN_3.1_D_Research and Development Business Case Template_V01 |
IN_3.1_D_Research and Development Close-Out Decision Record Template_V01 |
IN_3.1_D_Research and Development Implementation Plan Template_V01 |
IN_3.1_D_Research and Development Project Abstract Template_V01 |
IN_3.1_D_Research and Development Project Overview Template_V01 |
IN_3.1_D_Research and Development Project Plan Template_V01 |
IN_3.1_D_Research and Development Status Update Template_V01 |
IN_3.1_D_Research Development Execution Evaluation Decision Record Template_V01 |
IN_3.1_D_Roles, Responsibilities and Authorities 2013 Apr_V3.7 |
IN_3.1_D_Sleeve Inspection Program_V1.1 |
IN_3.1_R_L07 (20in) RE-WS 2011 Caliper GE Issue 1- PI Listing_V01 |
IN_3.1_R_L07 (20in) RE-WS 2011 USCD GE Issue 1- PI Listing_V01 |
IN_3.1_R_L2 EP-YP GW146830 PRID 9648_V01 |
IN_3.1_R_L2 EP-YP GW53220 PRID 9147_V01 |
IN_3.1_R_L2 EP-YP MP35.8988 GW49900_V01_Redacted |
IN_3.1_R_L2EP-YPMP104.8771GW146830_V01_Redacted |
IN_3.2_D_B1_02-02-04_V11 |
IN_3.2_D_B3_05-01-01_V12 |
IN_3.2_D_B3_05-03-01_V12 |
IN_3.2_D_B3_05-03-02_V12 |
IN_3.2_D_B3_05-03-03_V12 |
IN_3.2_D_B3_05-03-04_V12 |
IN_3.2_D_B3_05-03-05_V12 |
IN_3.2_D_B3_05-03-06_V12 |
IN_3.2_D_B3_05-03-07_V12 |
IN_3.2_D_B3_05-03-08_V12 |
IN_3.2_D_B3_06-02-03_V12 |
IN_3.2_D_B3_06-02-06_V12 |
IN_3.2_D_B3_06-03-12_V12 |
IN_3.2_D_B3_06-03-13_V12 |
IN_3.2_D_B3_06-03-19_V12 |
IN_3.2_D_B3_06-03-22_V12 |
IN_3.2_D_B3_06-04-01_V12 |
IN_3.2_D_B3_06-04-02_V12 |
IN_3.2_D_B3_06-04-03_V12 |
IN_3.2_D_B3_08-01-01_V11 |
IN_3.2_D_B3_08-03-01_V12 |
IN_3.2_D_B3_09-01-01_V12 |
IN_3.2_D_B3_09-02-02_V12 |
IN_3.2_D_B3_09-03-06_V12 |
IN_3.2_D_B3_09-03-07_V12 |
IN_3.2_D_B3_09-03-08_V12 |
IN_3.2_D_B4_00-00-TD_V14 |
IN_3.2_D_FI Mgmt Framework 2013 Apr_V04 |
IN_3.2_D_Field and Metallurgical Failure Investigation_V03 |
IN_3.2_D_Incident Response and Preparedness Plan_(IRAPP)_V1.0 |
IN_3.2_D_PI-14 Event Learning Process_V03 |
IN_3.2_D_PI-54 Girth Weld Crack Management_V02 |
IN_3.2_D_PIMS (IMS-09) Framework_V02 |
IN_3.2_D_Root Failure Investn Guide_V01 |
IN_3.2_FI-01 Ident of Hazards and Threats_V3.4 |
IN_3.3_D_Employee Transition Form Blank_V02.1 |
IN_3.3_D_Employee Transition Form_V02 |
IN_3.3_D_Management of Change Plan |
IN_3.3_D_PI MOC Form_V03 |
IN_3.3_D_PI-17 Employee Transition Procedure_V02 |
IN_3.3_D_PI-17 Employee Transition Procedure_V02.1 |
IN_3.3_D_PI-82 Pipeline Integrity Management of Change Procedure |
IN_3.3_D_PI-82 Pipeline Integrity Management of Change Procedure_V01 |
IN_3.3_D_PIMS (IMS-09) Framework_V02 |
IN_3.3_R_Employee Transition email request from QMS |
IN_3.3_R_ Employee Transition example_V02.0 |
IN_3.3_R_ Employee Transition_V01 |
IN_3.3_R_ Transition Form 2013_V01 |
IN_3.3_R_LP Management of Change communication_Redacted |
IN_3.3_R_LP Management of Change example Line 24 Integrity Transfer_Redacted |
IN_3.3_R_LP Management of Change example Line 3 MOP Reduction_Redacted |
IN_3.3_R_PI Management of Change example PE Form and NEB Notification |
IN_3.3_R_PI Management of Change example Vector Integrity Management Program Transition |
IN_3.3_R_PI MOC - Vector Transition_V01 |
IN_3.3_R_PI summary Ownership transfer to IM_V01 |
IN_3.3_R_Pipeline-Facilities Transition Plan_V04 |
IN_3.3_R_ 20131101 - Employee Transition Form_V01 |
IN_3.3_R_- Employee Transition example |
IN_3.3_R_Vector Transition Decision Record_V01 |
IN_3.4_D_PIMS (IMS-09) Framework_V02 |
IN_3.4_D_Technical Training Matrix Overview 2013 08 28_V00 |
IN_3.4_D_Training_and_Qualifications_Program_V03 |
IN_3.4_Documents and Records Summary |
IN_3.4_R_2012 Management Review Integrity Management System_V01 |
IN_3.4_R_Defect Assessment in Pipelines Attendance May 13-15, 2013_V01 |
IN_3.4_R_Employee Training History Feb 19 2003 - Feb 28 2014_V01 |
IN_3.4_R_ILI, Fracture Mechanics, SCC Nov 19-21, 2013_V01 |
IN_3.4_R_LP Engineering Learning Map_V01 |
IN_3.4_R_PI Orientation Checklist V4.1_V4.1 |
IN_3.4_R_PI Orientation Integrity Programs Mar 5, 2014_V01 |
IN_3.4_R_PI Orientation Integrity Systems Dec 2, 2013_V01 |
IN_3.4_R_Pipeline Integrity Management Programs and Systems Jan 7-9, 2014_V01 |
IN_3.4_R_Training Attendance Record - February 2014_V01 |
IN_3.4_Response to NEB IR No 1 |
IN_3.6_D_Facilities Integrity Master Document List_V01 |
IN_3.6_D_General Document Template_V01 |
IN_3.6_D_PI-15 Pipeline Integrity Management System (PIMS) Document Review Form_V01 |
IN_3.6_D_PI-15 Pipeline Integrity Management System (PIMS) Document Review_V02 |
IN_3.6_D_PI-74 Document Management Procedure_V01 |
IN_3.6_D_PIMS (IMS-09) Framework_V02 |
IN_3.6_D_PIMS Master Controlled Documents List_V00 |
IN_3.6_R_IMS MOC 13-06 revise PI-15 bi annual review and docs_V01 |
IN_3.6_R_IMS MOC 13-54 revise PI-04 with review form and docs_V01 |
IN_3.6_R_IMS MOC 13-57 PI-30 revision with review form and docs_V01 |
IN_4.1_D_PI-83 Health Check Procedure_V00 |
IN_4.1_D_PI-85 Regulatory Compliance Procedure_V01 |
IN_4.1_D_PI-88 Performance Measures Procedure_V01 |
IN_4.1_D_PIMS (IMS-09) Framework_V02 |
IN_4.1_R_OneSource Data Management System_V01 |
IN_4.2_D_PIMS (IMS-09) Framework_V02 |
IN_4.2_Documents and Records Summary |
IN_4.2_Response to NEB IR No 1 |
IN_4.3_D_PI-83 Health Check Procedure_V00 |
IN_4.3_D_PIMS (IMS-09) Framework_V02 |
IN_4.3_Documents and Records Summary |
IN_4.3_R_1 IMS Update communique |
IN_4.3_R_2 Coming changes communique |
IN_4.3_R_2013 Dig Program Effectiveness Health Check Plan_V01 |
IN_4.3_R_3 IMS Index screen shot |
IN_4.3_R_4 GDL screen shot |
IN_4.3_R_ELP Event - Dig Program Effectiveness Health (Quality) Check_V01 |
IN_4.3_Response to NEB IR No 1 |
IN_4.4_D_PI Information Management Records Retention Guideline_V00 |
IN_4.4_D_PI-08 ILI Report Collection, Processing and Storage_V04 |
IN_4.4_D_PI-09 NDE Field Report Collection, Processing and Storage_V03 |
IN_4.4_D_PIMS (IMS-09) Framework_V02 |
IN_4.4_D_Pipeline Integrity DMS User Guide_V01 |
IN_4.4_Documents and Records Summary |
IN_4.4_R_PipeTrax System - PI-08_V01 |
IN_4.4_R_Procedures Library_V01 |
IN_4.4_Response to NEB IR No 1 |
IN_5.0_D_PIMS (IMS-09) Framework_V02 |
IN_5.0_Documents and Records Summary |
IN_5.0_Response to NEB IR No 1 |
IN_5.1_D_2013 Management Review Integrity Management System V1 0 |
IN_5.1_R_2013 Management System Review Meeting Invitation |
IN_5.1_R_2013 Management System Review Project Plan |
IN_5.1_R_2013 PIMS - Management System Review Meeting Presentation |
IN_5.1_R_Continuous Improvement Plan V2 |
IN_D_3.2_B1_02-02-01_Incident_Reporting_CAN_CRITICAL_V11 |
IN_D_3.2_B1_02-02-03_Incident_Investigation_V11 |
IN_D_3.2_B1_02-02-04_Investigating_P_and_C_Failure_V11 |
IN_D_3.2_FI-12 Fitness-for-Service Overpressure March2014_V01 |
IN_D_3.2_Leak Reduction Team - Framework Document_V01 |
IN_D_General Tariff Violations |
IN_D_Guidelines for Inspection, Repair and Reporting for Station Piping (Feb 2014) |
IN_D_Station Piping Program Inspection Process Flowchart (Aug 2013) |
IN_R_3.1_FI-11 Appendix API 570 Gap Analysis (06-21-2013)_V01 |
IN_R_3.1_FI-11 Appendix API RP 2611 Gap Analysis (06-21-2013)_V01 |
IN_R_Bethune PDF Excerpt |
IN_R_Depth of Cover Records - Eastern Region |
IN_R_Enbridge New Stream |
IN_R_Highest Risk Piping (Bethune) |
IN_R_Highest Risk Piping (Regina) |
IN-2.1_D_FI Mgmt Program Aboveground Tank_V3.8 |
IN-DP 3 1 Documents and Records Summary |
IN-DP 3 1 Response to NEB IR No 1 |
IN-DP_3.1_D_Advanced_Line_Locator_Field_Manual_-_ Enbridge_FINAL_DRAFT_v3_TL_2-22-12 |
IN-DP_3.1_D_Canadian- One Call Procedures 2013_V01 |
IN-DP_3.1_D_Damage Prevention Assessment Procedure_V01 |
IN-DP_3.1_D_Data Mining Guidelines 2014_V01 |
IN-DP_3.1_D_DP Assessment Excavation Sites 2013 |
IN-DP_3.1_D_DP Assessment One Call Response 2013 |
IN-DP_3.1_D_DP Assessment TALL Competency 2013 |
IN-DP_3.1_D_Enbridge Baron B58 Operations Manual - Original Final |
IN-DP_3.1_D_Excavation_Site_Assessment_2014 |
IN-DP_3.1_D_LTU Unauthorized Crossing Process and Filing (23.07.12)_V01 |
IN-DP_3.1_D_OMM B3_03-01-01_Overview of ROW Maintenance_V01 |
IN-DP_3.1_D_OMM B3_03-02-01_Right-Of-Way Monitoring_V01 |
IN-DP_3.1_D_OMM B3_03-02-02_Right-of-Way Signs-Markers_V01 |
IN-DP_3.1_D_OMM B3_03-02-06_Depth of Cover Monitoring_V01 |
IN-DP_3.1_D_OMM B3_04-02-02_Damage Prevention_V01 |
IN-DP_3.1_D_One-Call_Response_Assessment_2014 |
IN-DP_3.1_D_Pipeline Depth Monitoring Program LP (July 2013)_V01 |
IN-DP_3.1_D_Safety Zone Excavation Request Form (April 2014)_V01 |
IN-DP_3.1_D_TALL Evaluation Form 2013-05-31_V01 |
IN-DP_3.1_D_TALL Training Classroom Presentation |
IN-DP_3.1_D_TALL Training Course_Syllabi_for__(12 11) |
IN-DP_3.1_D_TALL Training in-person Curriculum |
IN-DP_3.1_D_TALL__2011_(12 11) |
IN-DP_3.1_D_Tracking Storage Process_V01 |
IN-DP_3.1_D_Unauthorized Crossing Information Report_V01 |
IN-DP_3.1_R_10-2-1 Brochure(2012)_V01 |
IN-DP_3.1_R_DP Assessment One Call Response Tracking (2013)_V01 |
IN-DP_3.1_R_DP Assessment TALL Response Tracking (2013)_V01 |
IN-DP_3.1_R_Example Log Sheets Aerial Patrol May 2014 |
IN-DP_3.1_R_Final NEB Pipeline Protection measures 2012 signed by Mgt_V01 |
IN-DP_3.1_R_IMS Damage Prevention Function Model_V01 |
IN-DP_3.1_R_Line Locate Brochure (2013)_V01 |
IN-DP_3.1_R_Meeting 1 Minutes- October 11, 2012_V01 |
IN-DP_3.1_R_TALL Participants list_V01 |
In-Line Inspection Program Document |
IN-Ops_3.1_Documents and Records Summary |
IN-Ops_3.1_Response to NEB IR No 1 |
IN-PI 3.3 Documents and Records Summary |
IN-PI 3.3 Response to NEB IR No 1 |
IN-PI 3.6 Documents and Records Summary |
IN-PI 3.6 Response to NEB IR No 1 |
IN-PI_2 1_Documents and Records Summary |
IN-PI_2.1_Document and Record Map |
IN-PI_2.1_Response to NEB IR No 1 |
IN-PI_3.1_Document and Record Map |
IN-PI_3.1_Documents and Records Summary |
IN-PI_3.1_Response to NEB IR No 1 |
IN-PI_3.2_ Documents and Records Summary |
IN-PI_3.2_Document and Record Map |
IN-PI_3.2_Response to NEB IR No 1 |
IN-PI_4.1 Documents and Records Summary |
IN-PI_4.1 Response to NEB IR No 1 |
INTEGRITY IR - Facilities Integrity - September 15 2014 |
Integrity Management Program - Organization Inter-Relations |
Internal Corrosion Monitoring INTEGRITY IR- _27 Facilities Integrity - July 9 2014 |
IN-WB 3 1 Documents and Records Summary |
IN-W-B_2.1 Response to NEB IR No 1 |
IN-W-B_3.1 Response to NEB IR No 1 |
Document 1 |
Document 2 |
Letter to NEB Auditors re Treament of Documentation - Mar 25 2014 |
Likelihood of Failure for Small Diameter Piping - 2014 |
Line 3 PCV Bypass at Cromer Terminal - 2013 |
Line 3 PCV Bypass at Cromer Terminal 2009 |
Line 9 Station Bypass at North Westover Station - 2006 |
Line Repairs Program Document |
Line Replacement Program Document |
Line Summary Maps - 2013 |
LRT Meeting Minutes March 2014 |
LRT Update - 2013 in Review - COps 2013 December 19 |
Major Outage Coodination Upstream Downstream Lines |
Major Outage Coordination Downstream Lines(April 09 2014) NEB-regulated1 |
Major Outage Coordination Upstream Lines (April 09, 2014) NEB-regulated1 |
Mar 26-2014 Agenda and Safety Moment |
Mar 27-2014 Agenda and Safety Moment |
May Audit Schedule - Draft - IMP NEB Audit v3 |
Mentee List- Central |
Mentee List-Eastern Region |
Mentee List-Enbridge Sask |
Monitor Locations |
Monthly Tank Inspection Cromer TK 104 |
MP-CPCS-PROC-INHDD-006 |
NEB Audit Governance Level May Schedule |
NEB Geohazard Slope Instrumentation and IMU Run Summary 1 |
NEB Geohazard Slope Instrumentation and IMU Run Summary 2 |
NEB Org chart CR all v2 |
NEB Org chart EPSI all v2 |
NEB Org chart.ER.all |
NEB Org chart.NR.all |
NEB Org chart.WR.all |
NEB Regulated Pressure Vessels - Shipped Product Only |
NEB Regulated Pump Stations and Terminals |
NEB tanks 2014 and OOS inspections planned Rev1 |
OMM Awareness 101 Presentation_2014 Customized for GS Rollout |
Open System Template - Line 10 12in Line Proving Tool June 2014 Receiving |
Other |
PI_NDE Scope of Work_US _ CAN V1.2 |
PI-01 In-Line Inspection Report Quality Assurance_V03 |
Program Data Review - Top 10 probabilities of pipeline failure Determination |
PROTOCOL 3.1 - NEB Audit - Integrity - Geohazards May 14 GV MS (3) |
Redacted 2013 Crude Characteristics |
Redacted 2013 ILI Schedule - ICP Metrics |
Redacted May 15 SW |
Registry_Inventory |
Reliability Measurement - NEB v3 |
Response to Information Request re Rationale for ILI Intervals |
response_2014 Station Piping Scope of Work- NEB-Regulated Assets |
response_Eastern Canada Dig Schedule - Line 9 |
response_Eastern Canada Dig Schedule - Lines 8 and 11 |
response_Enbridge NEB tanks 2014 OOS inspections planned Rev1 |
response_NEB Regulated Pressure Vessels - Shipped Product Only |
response_Pig Runs-ILI -Maintenance Pigging Activities - May to August 2014 |
response_Station Piping Asset List - High IC Susceptible - NEB-Regulated Assets |
response_Western and Central Canada Dig Schedule |
Risk Register - Facilities Integrity v1 1 - Audit Copy |
Risk Register - Pipeline Integrity v2 |
RP_System Capacity_Rev1 |
SCOPE OF WORK - ABOVE GROUND STORAGE TANK - 2014 Summary-Final |
SCOPE OF WORK - PRESSURE EQUIPMENT- 2014 Summary-Final |
SCOPE OF WORK - SMALL DIAMETER PIPING - 2014 Summary-Final |
SCOPE OF WORK - SUMP - 2014 Summary-Final |
SDP Likelihood of Failure Inspection Guide - DRAFT |
SPR Map for NEB - Aug 2014 |
TRAC Syllabi V01 |
Vehicle Screening Tool - Hoop Stress Calculator V1-26-11 (line 9 30000lbs) |
Vehicle Screening Tool - Hoop Stress Calculator V1-26-11(line3 30000lbs) |
Western Region PSV Maintenance Report r1 |
Westspur Gathering System Internal Corrosion Program Details |
- Date modified: