Reports on Compliance and Enforcement
Below are searchable tables of reports on the work we do to check that companies are meeting requirements and the work we are doing to enforce those requirements. We take great care in making sure we enforce requirements in a manner that is fair predictable, consistent, timely, and transparent. Learn more about compliance and enforcement at the CER, our Enforcement Policy, and the tools available to enforce requirements.
Compliance verification activity reports
We go out in the field regularly to follow up with companies and to check that our regulations are being met. These regulations are there to protect people, property, and the environment. These reports are produced from field inspections and emergency response exercises that we do with companies. We’ll list whether we’ve issued a corrected non-compliance or a notice of non-compliance to a company in these reports.
- Corrected non-compliance (CNC): This is issued for a noncompliance corrected during an inspection activity. The non-compliance must be addressed to the satisfaction of the inspection officer before the officer completes the site inspection (before the close out meeting.
- Notice of non-compliance (NNC): If a company needs more time to address a noncompliance, the inspection officer issues what we call a notice of non-compliance.
Warning letters
We use warning letters in two ways: to let others know that a non-compliance still hasn’t been addressed and as a reminder about what may happen if the non-compliance happens again.
- A reminder: Sometimes we may need to let others know that a non-compliance is not being addressed. This helps us generate the action necessary to help a company return to compliance. Warning letters can be sent to senior company officials or third parties.
- A warning: We may also want to remind a company about how serious a non-compliance is, or was if they’ve already addressed it. The letter will warn of other enforcement action we may take if it happens again.
Search the table
Recipient | Description | Documents (yyyy-mm-dd) |
---|---|---|
Warner Petroleum | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-11-28 Warning Letter |
OTG Sourcing Inc. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-11-28 Warning Letter |
Blessing Logistics Ltd. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-11-28 Warning Letter |
Alerio Marketing Inc. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-30 Warning Letter |
North 60 Petro Ltd. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-30 Warning Letter |
Port Edward LNG Ltd. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-30 Warning Letter |
Suncor Energy Inc. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-30 Warning Letter |
Cenovus Energy Inc. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
1598313 Alberta Ltd. on behalf of Pembina Infrastructure and Logistics LP | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
Midstream Energy Partners (Canada) Ltd. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
United Energy Trading Canada ULC | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
Kiva Energy Inc. | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
PDV Midwest Refining, LLC | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
Gunvor USA LLC | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
Riovic Services Ltd | Non-compliance with the National Energy Board Export and Import Regulations filing requirements | 2024-10-07 Warning Letter |
Alliance Pipeline Ltd. | Non-compliance with section 8 of the Damage Prevention Regulations - Obligations, and ss. 6.5(1)(f) of the Onshore Pipeline Regulations | 2024-06-11 Warning Letter |
Tamarack Valley Energy Ltd. | Non-compliance with section 4 of the Damage Prevention Regulations - Authorizations | 2024-06-11 Warning Letter |
Subsurface Construction Corporation | Non-compliance with sections 10 and 12 of the Damage Prevention Regulations - Authorizations | 2024-06-11 Warning Letter |
Trans Mountain Pipeline ULC | Non-compliance with s.47.2 of the Canadian Energy Regulator Onshore Pipeline Regulations | 2020-09-10 Warning Letter |
Individual | Non-compliance with the Canada Energy Regulator Pipeline Damage Prevention Regulations – Authorizations | 2020-08-27 Warning Letter |
Portal Municipal Gas Company of Canada | Non-compliance with ss. 6.6 of the Onshore Pipeline Regulations | 2019-09-26 Warning Letter |
Canada Border Services Agency | Non-compliance with ss. 6.2 and 6.6 of the Onshore Pipeline Regulations | 2019-09-26 Warning Letter |
Canadian Natural Resources Limited | Non-compliance with ss. 6.6(1) of the Onshore Pipeline Regulations | 2019-03-22 Warning Letter |
AltaGas Limited | Non-compliance with ss. 6.6(1) of the Onshore Pipeline Regulations | 2019-01-22 Warning Letter |
Preet Excavating Ltd. | Non-compliance with the Pipeline Crossing Regulations, Part I and Damage Prevention Regulations – Authorizations | 2018-10-16 Warning Letter |
Surerus Murphy Joint Venture | Non-compliance with the NEB Act and Damage Prevention Regulations – Authorizations | 2018-10-16 Warning Letter |
City of Medicine Hat | Non-compliances with ss. 112(1) of the NEB Act, with the Pipeline Crossing Regulations, Part I and Damage Prevention Regulations – Authorizations | 2018-04-18 Warning Letter |
Potton Township | Non-compliance with ss. 112(1) of the NEB Act and ss. 6(b) of the Pipeline Crossing Regulations, Part I | 2017-01-27 Warning Letter |
Individual | Non-compliance with ss. 112(1)(2) of the NEB Act and ss. 6(b) of the Pipeline Crossing Regulations, Part I | 2017-01-27 Warning Letter |
Forty Mile Gas Coop Ltd. | Failure to comply with conditions of Abandonment Order ZO-F073-003-2013 | 2015-09-08 Warning Letter |
Canada Border Services Agency | Non-compliance to ss. 6.2 and 6.6 of the Onshore Pipeline Regulations for 2013 and 2014 | 2015-09-02 Warning Letter |
Inspection officer orders
An order issued by an inspection officer is a tool we may use to ensure company takes prompt action. A breach of an inspection officer order is a punishable offence and could mean fines, imprisonment, or both.
We may require a company to:
- immediately suspend work
- stop (cease) the operation or activity
- complete special measures or terms
Search the table
Original |
Date original IOO issued (YYYY/MM/DD) |
Associated Variance (s) |
Notice(s) to Resume Work or of Measures Satisfied |
Recipient (Company or Third-Party Individual) |
Work located in Prov./terr. |
IOO Description |
---|---|---|---|---|---|---|
LM-001-2024 | 2024-12-09 | N/A | N/A | Bluetec Construction Inc. (Bluetec) |
Oshawa, Ontario |
An alleged unauthorized activity consisting of unsafe ground disturbance work near Trans-Northern Pipelines Inc. (TNPI) infrastructure. Bluetec did not follow the conditions set out in TNPI’s consent that required a TNPI inspector be on site when conducting ground disturbance activities within the 30-meter prescribed area. |
RRW-001-2024 | 2024-11-28 | N/A | Notice to Resume Work or of Measures Satisfied 2024-12-03 | Trans Mountain Pipeline ULC (TMC) |
Abbotsford, British Columbia. |
The Contractors violation of not following Lockout-Tagout Procedures. The breakdown of the safety critical procedure was missed risk to workers across the company’s pipeline system |
LMR-001-2024 | 2024-11-14 | N/A | N/A | Plains Midstream Canada ULC |
ON |
Assessment of chloride contamination at Plains Windsor storage facility |
DJM-001-2024 | 2024-07-19 | Notice to Resume Work or of Measures Satisfied 2024-09-06 Notice to Resume Work or of Measures Satisfied 2024-08-14 |
Westcoast Energy Inc. |
BC |
Identified deficiencies in confined space entry safe work processes | |
JB-001-2024 | 2024-05-06 | VAR-001-JB-001-2024 2024-05-28 |
NOVA Gas Transmission Ltd. |
AB |
Incident review of the GPML rupture event (INC2024-025) | |
DRP-001-2024 | 2024-04-17 | Notice To Resume Work Or of Measures Satisfied 2024-04-18 |
NOVA Gas Transmission Ltd. |
AB |
Worker safety within exclusion zone.
|
|
JJD-001-2024 | 2024-03-12 | VAR-001-JJD-001-2024 2024-03-13 |
Notice To Resume Work Or of Measures Satisfied 2024-04-24 |
Trans Mountain Pipeline ULC | BC | Contractor oversight during nesting bird restricted period. |
2024-01-31 |
|
Trans Mountain Pipeline ULC |
BC |
Numerous identified deficiencies related to environmental protection plan compliance and water management. |
||
BL-001-2023 | 2023-11-23 | VAR-001-BL-001-2023 2023-11-29 |
Notice To Resume Work Or of Measures Satisfied 2024-01-09 |
Trans Mountain Pipeline ULC | BC | Requirement for hazard assessment to determine appropriate type of safety headwear. |
JJD-001-2023 | 2023-10-25 | VAR-001-JJD-001-2023 2023-10-28 |
Notice To Resume Work Or of Measures Satisfied 2023-11-10 |
Trans Mountain Pipeline ULC | BC | Multiple non-compliances with project Environmental Protection Plan at wetland crossing location. |
PRY-002-2023 | 2023-08-30 | VAR-001-PRY-002-2023 2023-09-28 |
Notice to Resume Work Or of Measures Satisfied 2024-06-19 | Trans-Northern Pipelines Inc. | ON | Third-party activity within the prescribed area, which included topsoil removal and ground disturbance which had the potential to cause damage to the TNPI federally regulated pipeline. |
PRY-001-2023 | 2023-08-30 | Notice To Resume Work Or of Measures Satisfied 2023-10-06 |
Blue Tec Construction Inc. | ON | Third-party activity within the prescribed area, which included topsoil removal and ground disturbance which had the potential to cause damage to the TNPI federally regulated pipeline. | |
AML-001-2023 | 2023-07-04 | Notice To Resume Work Or of Measures Satisfied 2023-10-24 |
Trans Mountain Pipeline ULC | BC | Non-compliances with Socio-Economic Effects Monitoring Plan (SEEMP) for the Project. | |
2022-12-19 |
|
Notice to Resume Work and Measures Partially Satisfied 2023-02-14 |
Trans Mountain Pipeline ULC (Trans Mountain) | AB, BC | Inconsistent practices for respiratory protective equipment (RPE) by workers performing or participating in welding tasks. |
|
2022-12-02 | VAR-001-DJM-001-2022
|
Notice to Resume Work or of Measures Satisfied – VAR-001-DJM-001-2022 |
NOVA Gas Transmission Ltd. |
BC |
Inappropriate worker use, handling, and storing of Methyl Ethyl Ketone (MEK). |
|
2022-08-31 | DRP-001-2022 (Amended)
|
Notice to Resume Work or of Measures Satisfied Notice to Resume Work and Measures Partially Satisfied |
NOVA Gas Transmission Ltd. |
AB |
Non-compliance with pipe unloading procedures. |
|
2021-11-03 |
|
Trans Mountain Pipeline ULC |
BC |
Inadequate erosion and sediment control. |
||
2021-10-09 |
|
Manitoba Hydro |
MB |
Non-compliance with Damage Prevention Regulations- depth of cover in agricultural areas. |
||
2021-10-08 |
|
Twin Rivers Paper Company |
NB |
Failure to demonstrate compliance with certificate condition. |
||
2021-08-06 |
DRP-002-2021 (Amended) 2021-08-12 |
Notice to Resume Work or of Measures Satisfied #2 Notice to Resume Work or of Measures Satisfied #1 |
Trans Mountain Pipelines |
BC |
Failure to demonstrate adequate contractor oversight and compliance with certificate conditions. |
|
2021-06-08 |
|
Trans-Northern Pipelines Inc. |
QC |
Failure to maintain a facility in accordance with deactivation requirements |
||
2021-04-15 |
|
Alliance Pipeline Ltd. |
AB |
Not meeting requirements in their Corrective and Preventative Action Plan related to their 2018/19 Integrity Program audit. |
||
2021-03-11 |
|
Express Pipeline Ltd. |
AB |
Missing labels on isolation points/valves and drawings which is not in conformance with the company’s equipment naming standard |
||
2021-06-03 |
|
Trans Mountain Pipeline ULC |
AB, BC |
Contractor oversight during nesting bird restricted period |
||
2021-01-27 |
|
Many Islands Pipe Lines (Canada) Limited |
AB, SK |
Failure to provide certification of worker supplied breathing air quality |
||
2020-12-04 |
|
Trans Mountain Pipeline ULC |
BC |
Not following the Trans Mountain COVID-19 Response Plan |
||
2020-12-03 |
|
Trans Mountain Pipeline ULC |
BC |
Not following the Trans Mountain COVID-19 Response Plan |
||
2020-10-30 | Trans Mountain Pipeline ULC |
AB |
Trans Mountain incident involving SA Energy Group |
|||
2020-04-14 |
Landowner |
ON |
Report of unauthorized activity on Line 10 |
|||
2020-01-28 |
|
NOVA Gas Transmission Ltd. |
BC |
Non-compliances and/or hazards to the environment. |
||
2019-12-18 |
|
TC Energy |
AB |
Lock-out-tag-out (LOTO) naming and tagging inconsistencies |
||
2019-10-02 |
|
Trans-Northern Pipelines Inc. |
ON |
Insufficient information provided in an Information Request on contaminated sites |
||
2019-08-28 |
|
Trans Northern Pipelines Inc. |
ON |
Repairs required to the swale system for water surface management |
||
2019-08-02 |
|
Notice to Resume Work or of Measures Satisfied Measure #3 Notice to Resume Work or of Measures Satisfied Measure #2 Notice to Resume Work or of Measures Satisfied Measure #1 |
Trans Northern Pipelines Inc. |
ON |
Deficiencies in the Environmental Remediation & Contaminated Sites Management Program |
|
2019-03-22 |
|
Trans Northern Pipelines Inc. |
ON |
Remediation activities |
||
2018-10-10 | NB-001-2018 (Amendment No. 3) NB-001-2018 |
Notice to Resume Work or of Measures Satisfied #9 Notice to Resume Work or of Measures Satisfied #8 Notice to Resume Work or of Measures Satisfied #7 Notice to Resume Work or of Measures Satisfied #6 Notice to Resume Work or of Measures Satisfied #5 Notice to Resume Work or of Measures Satisfied #4 Notice to Resume Work or of Measures Satisfied #3 Notice to Resume Work or of Measures Satisfied #2 Notice to Resume Work or of Measures Satisfied #1 |
Westcoast Energy Inc. |
BC |
Incident resulting in need to prove fitness for service. |
|
2018-11-30 |
|
NOVA Gas Transmission Limited |
BC |
Environmental activities |
||
2018-11-30 |
|
NOVA Gas Transmission Limited |
BC |
Wetlands mitigation activities |
||
2017-09-29 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
Pipe handling, hauling and stringing |
||
2017-09-13 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
Pipe handling, hauling and stringing |
||
2017-08-27 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
Bridges, watercourses |
||
2017-08-24 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
Access bridges, Riparian Management Areas, sediment and erosion control |
||
2018-08-23 |
|
Enbridge Pipelines Inc. |
MB |
Inability to demonstrate appropriate buffers are in place for wetlands |
||
2018-07-26 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
Sediment and erosion control issues at watercourses |
||
2018-06-04 |
|
Centra Transmission Holdings |
ON |
Project design and construction not following OPR and CSA |
||
2016-09-01 |
|
TransCanada PipeLines Limited |
ON |
Wall thickness value for blasting the pipe |
||
2015-11-19 |
|
NOVA Gas Transmission Ltd. |
AB |
Non-compliance with Project Environmental Protection Plan |
||
2015-11-26 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
INC2015-138 – Release of a toxic substance (amine) at the Pine River Gas Plant |
||
2015-06-19 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
Inability to demonstrate that the overhead cranes are safe to operate. |
||
2015-04-01 |
|
Westcoast Energy Inc. (Spectra Energy Transmission) |
BC |
Inability to demonstrate that there are a sufficient number of qualified workers to safely conduct operations |
||
2014-10-08 |
|
Landowner |
QC |
Unauthorized excavation activity |
||
2014-10-08 |
|
Landowner |
QC |
Unauthorized excavation activity |
||
2014-10-03 |
|
NOVA Gas Transmission Limited |
AB |
Restricted pressure increase |
||
2014-07-18 |
|
Enbridge Pipelines Inc. |
MB |
Failure to comply with a term or condition of any certificate, license, permit, leave or exemption granted under the NEB Act |
||
KF-002-2013 | 2013-12-10 |
|
|
NOVA Gas Transmission Limited |
AB |
Pipeline rupture / restriction on Return to Service |
2013-10-18 |
|
|
Vantage Pipeline |
SK |
Inadequate implementation of the construction inspection program |
|
2013-10-03 |
|
NOVA Gas Transmission Limited |
AB |
Pipeline rupture / restriction on Return to Service |
||
2013-02-04 |
|
Rokstad Power Corp. |
BC |
Unauthorized activities |
||
2013-02-04 |
|
BC Hydro |
BC |
Unauthorized activities |
||
2013-04-18 |
|
|
Canadian Natural Resources |
AB |
Does not meet pipeline regulations |
|
2013-01-16 |
|
Vantage Pipeline |
SK |
Inadequate buffers/ vehicle crossings for watercourse |
||
2012-09-20 |
|
Westcoast Energy Ltd (Spectra Energy Transmission Ltd) |
BC |
Uncontained disposal of hydrovac waste |
||
2012-11-19 |
|
Les Entreprises Nord-Construction |
QC |
Unauthorized activities on pipeline right-of-way |
||
2012-11-19 |
|
City of Boucherville |
QC |
Improper contractor oversight |
||
2012-12-19 |
|
Vantage Pipeline |
AB, SK |
Work taking place in contradiction of conditions of original Certificate |
||
2012-09-26 |
|
Vantage Pipeline |
AB, SK |
Unauthorized construction activities |
||
2012-06-13 |
|
Montreal Pipe Line Ltd. |
QC |
Release of hydrovac slurry |
Commission orders and directions
If we’re having trouble bringing a company into compliance with other tools or we need to address a specific safety or environmental concern, we may issue an order or letter of direction from the Commission. They can be issued at any time and may contain measures a company must take to address issues or non-compliances. A breach of a commission order or direction is a punishable offence and could mean fines, imprisonment, or both.
Search the table
Order Number |
Related Documents |
Last Updated (yyyy-mm-dd) |
Recipient | Region/ Facility |
Description |
---|---|---|---|---|---|
MO-022-2024 [Filing C30768] | 2024-07-22 | 1057533 Alberta Ltd. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-023-2024 [Filing C30770] | 2024-11-12 | 2670568 Ontario Ltd. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-024-2024 [Filing C30771] | 2024-07-22 | ARC Resources Ltd. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-025-2024 [Filing C30772] | 2024-07-22 | Canadian-Montana Pipe Line Company | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-027-2024 [Filing C30774] | 2024-07-22 | Canlin Energy Corporation | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-028-2024 [Filing C30775] | 2024-07-22 | Enercapita Energy Ltd. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-029-2024 [Filing C30776] | 2024-07-22 | Energy Transfer Operations GP LLC on behalf of Sunoco Pipeline LP | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-030-2024 [Filing C30777] | 2024-07-22 | Gear Energy Ltd. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-031-2024 [Filing C30778] | 2024-07-22 | ISH Energy Ltd. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-032-2024 [Filing C30779] | 2024-07-22 | Kiwetinohk Energy Corp. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-033-2024 [Filing C30780] | 2024-07-22 | Pieridae Alberta Production Ltd. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-034-2024 [Filing C30781] | 2024-07-22 | Prospera Energy Inc. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-035-2024 [Filing C30782] | 2024-07-22 | SCL Pipeline Inc. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-036-2024 [Filing C30783] | 2024-07-22 | Surge Energy Inc. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-037-2024 [Filing C30784] | 2024-07-22 | Tamarack Acquisition Corp. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
MO-038-2024 [Filing C30785] | 2024-07-22 | Yoho Resources Inc. | Canada | Non-compliance with respect to providing a new or amended financial instrument following the Five-Year Review of Abandonment Cost Estimates and Set-Aside and Collection Mechanisms 2021 | |
SG-C293-01-2011 | 2012-09-18 | Centra Transmission Holdings Ltd. | Birmingham (MI), USA | Non-compliance with Board Order | |
SG-T201-002-2011 | 2011-10-28 | TransCanada PipeLines Limited, on behalf of Trans Québec & Maritimes Pipeline | Line 2000 | Pipeline anomalies | |
SO-E102-002-2011 | 2013-13-22 | Enbridge Pipeline (NW) Inc. | Norman Wells to Zama Pipeline (Line 21), at Willow Lake River (NT) | Release of crude oil | |
SO-P384-004-2011 | 2011-12-01 | Plains Midstream Canada | Milk River (AB) and the Wascana (SK) crude oil mainlines | Issues from 2009 audit | |
OF-Surv-Gen 01 | 2012-08-24 | Enbridge Pipeline Inc. | Edmonton (AB) | NEB to inspect Control Centre | |
SG-C293-002-2012 | 2014-06-11 | Centra Transmission Holdings Ltd. | Birmingham (MI), USA | Non-compliance with Board Order | |
SG-W102-001-2012 | 2012-09-18 | Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) | Nig Creek Pipeline (BC) | Pipeline rupture | |
SO-K077-005-2012 | 2012-12-21 | Kinder Morgan | Cochin Pipeline System | Stress Corrosion Cracking failure on US system | |
SO-T241-002-2012 | 2014-06-04 | TransCanada PipeLines Limited (TransCanada) on behalf of TransCanada Keystone Pipeline GP Limited (Keystone) | Portage La Prairie, Rapid City, Moosomin and Richardson (MB, SK) | Lack of alternate power source for pump stations | |
CO-001-2013 | 2013-10-18 | Imperial Oil Resources Ltd. | Norman Wells Production Facility (NT) | Flowline Leaks | |
SG-D081-01-2013 | 2014-04-15 | DR Four Beat Energy Corp. | Knappen Border Pipeline and associated facilities (AB) | Failure to file an Emergency Procedures Manual; inadequate emergency signage and contact information | |
SG-N081-001-2013 | 2014-12-18 | TransCanada PipeLines Limited | NOVA Gas Transmission Ltd. Grande Prairie Mainline Loop (Elmworth Section) (AB) | Pipeline anomaly | |
SG-N081-004-2013 & SG-N081-005-2013 | 2013-12-20 | NOVA Gas Transmission | NPS 8 Mitsue Lateral and NPS 6 Ukaltal Lateral (AB) | Gas Leaks | |
SG-N081-006-2013 | 2013-12-20 | NOVA Gas Transmission | NPS 24 North Lateral Extension Loop (AB) | Gas Leak | |
SG-T211-003-2013 | 2013-08-30 | TransCanada PipeLines Limited | Compressor stations (ON, SK, AB) | Incidents involving a fire or an explosion in compressor/meter stations in 2009, 2011 and 2012 | |
OA-1204-003-2013 | 2013-02-15 | Husky Oil Operations Ltd. | Husky Little Bear wells and facilities (NT) | Health and safety issues at work camp | |
SO-E101-001-2013 | 2013-05-02 | Enbridge Pipeline Inc. | System wide | Emergency back-up power and push button shut down keypads at pump stations | |
SO-E101-002-2013 | 2013-05-23 | Enbridge Pipeline Inc. | System wide | Cracking incidents | |
SO-E101-003-2013 | 2013-06-17 | Enbridge Pipeline Inc. | Edmonton Control Room | Regulatory requirements | |
SO-E101-004-2013 | 2013-06-03 | Enbridge Pipeline Inc. | Edmonton Terminal (AB) | Overpressure incidents | |
SO-T217-003-2013 | 2013-08-29 | Trans-Northern Pipelines | Return to Full Pressure from Montreal to Farran’s Point | Integrity Management Program - Application to Increase Pressure Pursuant to Safety Order SO-T217-03-2010 | |
SO-T260-005-2013 | 2014-10-24 | Kinder Morgan Canada Inc. | Trans Mountain Pipeline | NPS 24 Mainline - Liquids Leak | |
GPLO-C298-003-2014 | 2014-04-21 | Canadian Natural Resources Limited (CNRL) | Ladyfern Pipeline (AB) | Unsupervised hydrostatic test | |
OC-062-2015 | 2015-01-23 | Enbridge Pipelines Inc. | Edmonton to Hardisty Pipeline Project (AB) | Application for a Variance of the Certificate to Allow for Modifications to the Project Specifications | |
OPLO-K077-004-2014 | 2014-07-16 | Kinder Morgan | Elmore, Saskatchewan, Fort Saskatchewan, Alberta Portion | Cochin Pipeline System Reversal Project | |
SG-N081-001-2014 | 2021-02-01 | NOVA Gas Transmission | Canada | Restriction on return to service | |
SG-T211-002-2014 | 2020-11-03 | TransCanada Pipelines Limited | Canadian Mainline Line 100-4 at MLV 2 + 3.3 km near Burstall (SK) | Engineering Evaluation for Temporary Pressure Reduction Relaxation | |
SG-W102-003-2014 | 2014-05-28 | Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) | Nig Creek Pipeline (BC) | Gas release | |
SO-P384-001-2014 | 2014-03-17 | Plains Midstream Canada | Milk River (AB) and the Wascana (SK) crude oil mainlines | Pressure restriction on oil mainline | |
M0-066-2015 | 2015-11-12 | Enbridge Pipelines (NW) Inc. | British Columbia | Requesting Approval to Modify Two Requirements Of Safety Order SO-E102-002-2011, as Amended Revision to NEB Letter Dated 16 November 2015 and Order Approved 12 November 2015 | |
SG-N081-001-2015 | 2015-05-21 | NOVA Gas Transmission | Western AB System Mainline, Airdrie (AB) | Change of Class Location | |
SG-W102-002-2015 | 2016-07-15 | Westcoast Energy Inc. (Spectra Energy Transmission) | Canada | Address a number of concerns with respect to the operations at Westcoast’s processing plants and facilities | |
SO-P384-001-2015 | 2015-01-15 | Plains Midstream Canada ULC | Canada | 2010 Operational Audit - Implementation of Safety Management and Environmental Protection Program Corrective Actions | |
Letter | 2015-03-04 | Enbridge Pipelines Inc. | Line 9B Reversal and Line 9 Capacity Expansion Project, Westover to Montreal Terminal | Request for information on use of Non-Disclosure Agreements regarding Emergency Information | |
Letter [PDF] |
|
2015-05-02 | Non-Disclosure Agreements for Emergency Procedures Manuals | ||
MO-020-2016 | 2016-05-24 | TransCanada Keystone Pipeline GP Ltd. | (AB) | Field Inspection, Environmental Protection CVA 1516-431 | |
SO-P384-001-2016 | 2016-02-11 | Plains Midstream Canada ULC | Ontario | Windsor Sarnia Pipeline Reactivation Order MO-011-2012 (Order) Plains’ Final Reports pursuant to Conditions 4, 5 and 6 of the Order |
|
AO-001-SO-T217-03-2010 |
|
2024-11-25 | Trans-Northern Pipelines Inc | Canada | Overpressure and Pipeline Exposure Incidents |
XG-C357-09-2010 | 2014-08-07 | Lone Pine Resources Canada Ltd. | Ojay Pipeline | Variance to Order XG-C357-009-2010. Failure to comply with Condition 15 of Order XG-C357-09-2010 | |
XO-T260-009-2013 | 2014-05-08 | Trans Mountain Pipeline ULC (Kinder Morgan Canada) | Edmonton (AB) | Order XO-T260-009-2013 - Leave to Open Application | |
XG-N081-021-2013 | 2014-04-28 | NOVA Gas Transmission | Musreau Lake West Receipt Meter Station | Order XG-N081-021-2013 - NGTL Application for Leave to Open | |
OF-Surv-Inc-2012 81 | 2012-09-07 | Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) | Nig Creek Pipeline (BC) | Pipeline rupture / restriction on Return to Service | |
OF-Surv-Inc-2013 110 | 2012-09-07 | Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) | Nig Creek Pipeline (BC) | Pipeline rupture / restriction on Return to Service | |
Letter Decision | 2020-07-22 | Trans-Northern Pipelines Inc. | Canada | Commission’s decision to deny TNPI’s request for confidential treatment of Historical Spills, Leaks and Damage Incident Inventory Information | |
ORD-OO-001-2022 | CER Letter | 2022-03-23 | Inuvialuit Petroleum Corporation | Inuvik, NT | Order and direction to IPC to obtain authorizations and operating licence for geotechnical work and remaining work associated with the TUK M-18 access road and sump. |
Audit reports
Once we finish an audit of a company we regulate, we publish a report and a letter closing the audit. We expect all companies to consider and review the findings in these reports and use them to improve their management systems.
Search the table
Auditee | Year of Program | Audit Topic | Documents | Last Updated (yyyy-mm-dd) |
---|---|---|---|---|
Many Islands Pipe Lines (Canada) Limited | 2024 | Emergency Management | Audit Report CV2425-003 |
2024-10-01 |
Westcoast Energy Inc. | 2023 | Damage Prevention | Audit Report CV2324-229 [PDF] |
2024-04-15 |
PKM Cochin ULC | 2023 | Control Room Management | 2024-06-12 | |
NorthRiver Midstream | 2023 | Control Room Management | Audit Report CV2324-217 [PDF] |
2024-02-17 |
Trans Mountain Pipeline ULC | 2023 | Control Room Management | 2024-03-01 | |
Trans-Northern Pipelines Inc. | 2023 | Damage Prevention | Audit Report T217-2023-2024 0101 [PDF] |
2023-11-06 |
Foothills Pipe Lines Ltd. | 2023 | Damage Prevention | 2023-11-24 | |
Maritimes & Northeast Pipeline Management Ltd | 2022 | Damage Prevention | Audit Report M124-2022-2023 01 [PDF] |
2023-05-16 |
Plains Midstream Canada ULC | 2022 | Damage Prevention | Audit Report P384-2022-2023 0101 [PDF] |
2023-04-13 |
PKM Cochin ULC | 2021 | Contaminated Sites Management | 2023-04-13 | |
TransCanada PipeLines Limited | 2022 | Contaminated Sites Management | Audit Report T211-2022-2023 0101 [PDF] |
2023-03-23 |
Trans-Northern Pipelines Inc. | 2022 | Contaminated Sites Management | Audit Report T217-2022-2023 0101 [PDF] |
2023-03-15 |
Enbridge Pipelines Inc. | 2022 | Contaminated Sites Management | 2024-03-05 | |
NOVA Gas Transmission Ltd. (NGTL) | 2022 | Damage Prevention | 2022-11-29 | |
ISH Energy Ltd | 2021 | Contaminated Sites Management | Audit Report I146-2021-2022 01 [PDF] |
2022-03-31 |
Campus Energy Partners Operations Inc. | 2021 | Annual Report | Audit Report C1017-2021-2022 01 [PDF] |
2022-03-11 |
Plains Midstream Canada ULC | 2021 | Contaminated Sites Management | Audit Report P384-2021-2022 0101 [PDF] |
2022-02-03 |
Emera Brunswick Pipeline Company Limited | 2021 | Annual Report | 2021-12-07 | |
Kingston Midstream Westspur Limited | 2021 | Contaminated Site Management | 2022-08-29 | |
Enercapita Energy Ltd. | 2020 | Annual Report | Audit Report E284-2020-2021 0101 [PDF] |
2021-04-13 |
Pembina Pipeline Corporation | 2020 | Annual Report | Audit Report P108-2020-2021-01 [PDF] |
2021-04-08 |
Cenovus Energy Inc. | 2020 | Annual Report | Audit Report C933-2020-2021 01 [PDF] |
2021-03-26 |
ARC Resources Limited (ARC) | 2020 | Annual Report | 2022-08-12 | |
Nova Gas Transmission Ltd. (NGTL) | 2019 | Contractor Oversight | Audit Report N081-2019-2020 0101 [PDF] |
2021-01-11 |
Westcoast Energy Inc., carrying on business as Spectra Energy Transmission | 2019 | Contractor Oversight | Audit Report W102-2019-2020 01 [PDF] |
2020-07-31 |
Plains Midstream Canada ULC | 2019 | Control Room Management | Audit Report P384-2019-2020-01 [PDF] |
2020-10-20 |
Trans Mountain Pipeline Canada ULC | 2019 | Contractor Oversight | 2021-04-21 | |
Trans-Northern Pipelines Inc. | 2019 | Control Room Management | 2021-05-13 | |
TransCanada Keystone Pipeline GP Ltd. | 2018 | Pre-Construction Compliance | Audit Report T241-2018-2019 01 [PDF] |
2021-01-18 |
Enbridge Pipelines Inc. | 2019 | Control Room Management | Audit Report E101-2019-2020-01 [PDF] |
2021-01-19 |
Veresen Energy Pipeline Incorporated | 2018 | Quality Assurance Program | Audit Report V044-2018-2019-01 [PDF] |
2021-02-05 |
Montreal Pipe Line Limited | 2018 | Integrity Management Program | Audit Report M253-2018-2019-01 [PDF] |
2019-02-19 |
AltaGas Holdings Inc. | 2018 | Quality Assurance Program | Audit Report A174-2018-2019-01 [PDF] |
2020-05-08 |
Canadian Natural Resources Limited | 2018 | Integrity Management Program | Audit Report C298-2018-2019 01 [PDF] |
2020-07-07 |
Emera Brunswick Pipeline Company Ltd. | 2018 | Quality Assurance Program | Audit Report E236-2018-2019-01 [PDF] |
2018-12-18 |
Alliance Pipeline Ltd. | 2018 | Integrity Management Program | 2022-03-02 | |
Tundra Energy Marketing Limited – Westspur Pipelines Limited | 2017 | Emergency Management Program | Audit Report T309-2017-2018 01 [PDF] |
2018-06-26 |
Many Islands Pipe Lines (Canada) Limited | 2017 | Hazard and Risk Assessment as related to Emergency Management | Audit Report Ml82-2017-2018 01 |
2018-05-24 |
Enbridge Gas Distribution Inc. (2193914 Canada Limited) and Niagara Gas Transmission Limited (Enbridge Gas Distribution Inc.) | 2017 | Hazard and Risk Assessment as related to Emergency Management | Audit Report Z034-2017-2018 01 |
2018-12-18 |
TransCanada Keystone Pipeline GP Ltd. | 2017 | Emergency Management Program | Audit Report T241-2017- 01 |
2018-03-07 |
Trans Mountain Pipeline ULC | 2015 | Report of the Emergency Management Program | Audit Report T260-2015-2016 01 [PDF] |
2019-06-24 |
Enbridge Pipeline Inc. | 2014 | Pre-Construction Compliance Line 3 Replacement Project | Audit Report E101-2014-11 04 [PDF] |
2017-10-19 |
Trans Mountain Pipelines ULC. | 2016 | Pre-Construction Compliance | Audit Report T260-2016-2017 0101 |
2017-08-03 |
Kinder Morgan Cochin ULC | 2016 | 4.1 Inspection, Measurement and Monitoring | Audit Report K077-2016-2017 01 |
2017-06-19 |
Plains Midstream Canada ULC. Aurora Pipeline Company Ltd. |
2016 | 4.2 Investigation and Reporting Incidents and Near Misses | Audit Report P384-2016-2017 01 [PDF] |
2017-05-10 |
Plains Midstream Canada ULC. Aurora Pipeline Company Ltd. |
2016 | 4.1 Inspection, Measurement and Monitoring | Audit Report P384-2016-2017 02 [PDF] |
2017-04-18 |
Trans Mountain Pipelines ULC. | 2016 | 4.1 Inspection, Measurement and Monitoring | Audit Report T260-2016-2017 01 |
2017-03-27 |
Pembina Energy Services Inc. | 2016 | 4.2 Investigation and Reporting Incidents and Near Misses | Audit Report P749-2016-2017 01 |
2017-03-14 |
Maritimes & Northeast Pipeline Management Ltd | 2016 | 4.2 Investigation and Reporting Incidents and Near Misses | Audit Report M124-2016-2017 01 |
2017-03-06 |
Westcoast Energy Inc., Carrying on Business as Spectra Energy Transmission | 2016 | 4.1 Inspection, Measurement and Monitoring | Audit Report W102-2016-2017 01 |
2019-02-12 |
Trans-Northern Pipelines Inc. | 2016 | 4.1 Inspection, Measurement and Monitoring | Audit Report T217-2016-2017 01 |
2017-01-18 |
Express Pipeline Ltd. | 2016 | 4.2 Investigation and Reporting Incidents and Near Misses | Audit Report E092-2016-2017 01 |
2017-05-01 |
Alliance Pipeline Ltd. | 2014 | Third Party Crossings, Emergency Management, Environmental Protection, Safety Management and Public Awareness | Audit Report A159-2014-2015 02 |
2016-03-31 |
Enbridge Pipelines Inc. | 2014 | Third Party Crossings, Emergency Management, Environmental Protection, Safety Management and Public Awareness | Audit Report E101-2014-2015 03 |
2015-03-31 |
Plains Midstream Canada ULC | 2009 | Safety Management and Environmental Protection | Audit Report P102-2009-2010 01 |
2014-08-14 |
TransCanada Pipelines Limited | 2013 | Third Party Crossings, Emergency Management, Environmental Protection, Safety Management and Public Awareness | Audit Report T211-2013-2014 01
|
2014-03-31 |
Westcoast Energy Inc., carrying on business as Spectra Energy Transmission (Westcoast) | 2010 | Integrity Management, Safety Management, Environmental Protection and Emergency Management | Audit Report W102-2010-2011 01 [PDF] |
2013-03-23 |
Spectra Energy Empress Management Inc. (Spectra Energy Empress L.P. (SET-PTC)) | 2012 | Integrity Management, Safety Management, Environmental Protection, Emergency Management, Third Party Crossing and Public Awareness | Audit Report S380-2012-13 01 |
2013-03-22 |
Westcoast Energy Inc., carrying on business as Spectra Energy Transmission (Westcoast) | 2011 | Integrity Management, Safety Management, Environmental Protection, Emergency Management, Third Party Crossing and Public Awareness | Audit Report W102-2011-2012 01 |
2013-03-22 |
TransCanada Pipelines Limited | 2012 | Integrity Management | Audit Report T211-2012-2013 01 |
2012-10-30 |
Maritimes and Northeast Pipeline Ltd | Integrity Management, Safety Management, Environmental Protection, Emergency Management, Third Party Crossing and Public Awareness | Audit Report M124 01 |
2012-05-25 | |
Emera Brunswick Pipeline Company Ltd. | Integrity Management, Safety Management, Environmental Protection, Emergency Management, Third Party Crossing and Public Awareness | Audit Report E236 01 |
2012-04-27 |
Administrative monetary penalties
Both companies and individuals can get fined for actions that are unsafe. It’s important that we take action to prevent harm and help stop something that could be dangerous from happening again.
We may fine a company or individual if:
- serious harm has been caused or is likely to happen
- the nature and severity of the non-compliance is significant
- we need to escalate to a higher level of enforcement
- we need to change behavior to prevent an issue from happening again
Maximum daily penalty per violation: We have a limit on how much a penalty for each violation can be each day. For individuals: $25,000.00. For companies: $100,000.00.
When a violation continues: A violation is considered a separate violation for each day that it continues. This means we issue separate penalties per violation, per day with no maximum total financial penalty.
No total limit: There is no total limit to how much an individual or company can be fined for a single violation. Only a daily maximum for each violation.
Find out more on how we calculate administrative penalties and about our process in the Administrative Monetary Penalties Process Guide, the Administrative Monetary Penalties Regulations (Canadian Energy Regulator), and the Canada Oil and Gas Operations Administrative Monetary Penalties Regulations.
Search the table
For companies, you’ll see the name of the company, the date we issued the penalty, where and for what facility, the violation, and how much. We protect privacy and do not release the names of individuals.
Reference Number |
Related Documents |
Last Updated (yyyy-mm-dd) |
Recipient | Region/ Facility |
Description | Penalty Amount |
---|---|---|---|---|---|---|
AMP-001-2023 | 2023-09-20 | Minell Pipeline Ltd. | McAuley (MB) | Section 7 of the DPRs – Obligation of Pipeline Companies Failure to identify and notify of locations as prescribed | $52,000 | |
AMP-004-2022 | 2022-10-27 | Trans Mountain Pipeline ULC | Spread 1, Trans Mountain Expansion Project | Failure to implement management system process for verifying that employees and other persons working with or on behalf of the company were trained and competent and for supervising them to ensure that they performed their duties in a manner that was safe, pursuant to 6.5(1)(k) of the Onshore Pipeline Regulations. | $88,000 | |
AMP-003-2022 | 2022-10-27 | Trans Mountain Pipeline ULC | Spread 1, Trans Mountain Expansion Project | Failure to implement a management system process for identifying and analyzing all hazards and potential hazards pursuant to 6.5(1)(c) of the Onshore Pipeline Regulations, and comply with Condition 2 of OC-065, a designated violation under ss.2(3) of the AMP Regulations. | $76,000 | |
AMP-001-2022 | 2022-12-22 | Trans Mountain Pipeline ULC | Spread 7B, Trans Mountain Expansion Project | Inadequately implementing management system requirements for establishing and implementing processes, as required by sections 6.5(1)(k) and (q) of the Onshore Pipeline Regulations | $4,000 | |
AMP-002-2022 | 2022-03-12 | Trans-Northern Pipelines Inc. | Oakville (ON) | s. 45.1 of the Onshore Pipeline Regulations – “If a company proposes to decommission a pipeline or part of one, the company shall submit an application for the decommissioning to the Commission” | $100,000 | |
AMP-001-2021 | 2021-03-12 | Trans-Northern Pipelines Inc. | Ontario | Failure to have an adequate Environmental Protection Program, particularly related to contaminated sites, as required by section 48 of the Onshore Pipeline Regulations | $40,000 | |
AMP-002-2020 | 2020-11-12 | Westcoast Energy Inc. | near Prince Georg (BC) | Violation of ss. 4(2) of the Onshore Pipeline Regulations – failure to ensure that the pipeline is operated in accordance with the programs, manuals, procedures, measures and plans developed and implemented by the company | $40,000 | |
AMP-001-2020 | 2020-06-25 | Trans-Northern Pipelines Inc. | Oakville, Ontario | s. 29 of the Onshore Pipeline Regulations – Failure to contract for services as prescribed | $40,000 | |
AMP-001-2019 | 2019-06-14 | Plains Midstream Canada | Regina, Saskatchewan | Failure to locate a pipeline as prescribed by para. 6(1)(b) of the Damage Prevention Regulations – Obligations | $76,000 | |
AMP-002-2018 | 2018-07-10 | Trans-Northern Pipelines Inc. | Montreal Feeder System | Contravention of a Board Order | $28,000 | |
AMP-001-2018 | 2018-06-25 | Canadian Natural Resources Ltd. | Ojay Pipeline | Failure to comply with condition of a Board Order re: PCEMR submission | $40,000 | |
AMP-001-2017 | 2017-12-07 | Landstar Projects | Surrey (BC) | 6(b) of the PCR, Part I for an unauthorized activity without written permission from the pipeline company prior to excavation | $28,000 | |
AMP-012-2015 | 2015-12-02 | Conoco Phillips Canada Operations Ltd. | Elmworth Station U to B Pipeline Integrity Project, Beavertail Creek (AB) | 30(1) of the Act – Operation of a pipeline without a certificate and leave to open (Type B) | $28,000 | |
AMP-011-2015 | 2015-07-29 | Melcor Developments Ltd. | Rosenthal Blvd and 224 Street, Edmonton (AB) | 112(1) of the Act – Construction of a facility or excavation without leave (Type B) | $28,000 | |
AMP-010-2015 | 2016-03-02 | Enbridge Pipelines Inc. | Line 4, Strome (AB) | 4 of the OPR – Failure to ensure that a pipeline is designed, constructed, operated or abandoned as prescribed (Type B) | $28,000 | |
AMP-009-2015 | 2016-03-02 | Westcoast Energy Inc. (Spectra Energy Transmission) | Transmission North Expansion Project (BC) | 2(3) of the AMP – Failure to comply with Condition 7 of Order XG-W102-005-2011 | $4,000 | |
AMP-008-2015 | 2015-04-17 | Westcoast Energy Inc. (Spectra Energy Transmission) | Pine River Gas Plant (BC) | 49(1.1) of the PPR – Failure to notify as Prescribed (Type A) | $6,300 | |
AMP-007-2015 | 2016-02-12 | Enbridge Pipelines Inc. | Edmonton to Hardisty Pipeline Project (AB) | Failure to comply with Condition 2 of Order XO-E101-006-2014 | Rescinded | |
AMP-006-2015 | 2016-02-12 | Enbridge Pipelines Inc. | Plains Wascana Tank 80 (SK) | Failure to comply with Condition 2 of Order XO-E101-021-2013 | Rescinded | |
AMP-005-2015 | 2016-03-10 | Enbridge Pipelines Inc. | Line 3 replacement project construction site, Cromer (MB) | 2(3) of the AMP – Failure to comply with Condition 3 of Order XO-E101-016-2013 | $76,000 | |
AMP-004-2015 | 2016-02-05 | Enbridge Pipelines Inc. | Replacement pipeline between the Cromer Terminal and the tie-in point within NW-9-926 WPM | Failure to comply with Condition 2 of Order XO-E101-016-2013 | Rescinded | |
AMP-003-2015 | 2015-02-12 | Plains Midstream Canada ULC (Plains) | Canada | 53(1) and 55 of the OPR – Failure to conduct inspections and audits as prescribed (Type B) and Failure to document the audit as prescribed (Type B) | $76,000 | |
AMP-002-2015 | 2015-02-06 | Enbridge Pipelines Inc. | Edmonton to Hardisty Pipeline Project (AB) | 2(3) of the AMP – Failure to comply with Condition 2 of Order XO-E101-006-2014 | $16,000 | |
AMP-001-2015 | 2015-01-22 | Westcoast Energy Inc. (Spectra Energy Transmission) | Dawson Creek Gas Plant (BC) | 4(1) of the PPR – Failure to ensure that the company’s processing plant is designed, constructed, operated or abandoned as prescribed (Type B) | $88,000 | |
AMP-006-2014 [PDF] | 2014-12-15 | Lone Pine Resources Canada Ltd. | Ojay Pipeline | 2(3) of the AMP – Non-compliance with Condition 15 of Order XG-C357-09-2010 | $28,000 | |
AMP-005-2014 [PDF] | 2014-09-08 | Steve Minotakis (Dr Four Beat Energy Corporation) | Meter station and piping between NW5-1-11W4 and SW-1-11WA near Aden (AB) | 2(2) of the AMP – Non-compliance with Conditions 3 and 4 of Order SG-D081-01-2013 | $25,000 | |
AMP-004-2014 [PDF] | 2014-12-11 | Dr Four Beat Energy Corporation | Meter station and piping between NW5-1-11W4 and SW-1-11WA near Aden (AB) | 2(2) of the AMP – Non-compliance with Conditions 3 and 4 of Order SG-D081-01-2013 | $100,000 | |
AMP-003-2014 [PDF] | 2014-07-02 | Trans Mountain Pipeline ULC | Nipisi Facility Piping at the Trans Mountain Edmonton Terminal (AB) | 2(3) of the AMP – Non-compliance with Condition 2 of Order XO-T260-009-2013 | $16,000 | |
AMP-002-2014 | 2014-11-20 | Canadian Natural Resources Ltd. | Ladyfern Pipeline | 25 of the OPR – Failure to perform pressure testing as prescribed (Type B) | $28,000 | |
AMP-001-2014 [PDF] | 2014-05-23 | Nova Gas Transmission Ltd. | Musreau Lake West Receipt Meter Station (AB) | 31(a) of the Act – Construction of a pipeline without a certificate (Type B) | $16,000 |
- Date modified: